During a verification, what is required regarding building 'As-Built' drawings?

S537 Section 4.5 requires that the verifying party confirms the 'As-Built' drawings match the actual field installation before final sign-off.

Start free practice for ASTTBC RFPT — Fire Alarm Systems (AL)

30 questions · no signup required · 40 free questions per day

Start Practice →

Question: During a verification, what is required regarding building 'As-Built' drawings?

Answer options:

  • The drawings must be signed by the architect only ✅ The drawings accurately reflect the actual field device locations and types
  • The drawings are printed on 24x36 paper
  • The drawings show the future system expansion areas

Correct answer: The drawings accurately reflect the actual field device locations and types

Explanation: S537 Section 4.5 requires that the verifying party confirms the 'As-Built' drawings match the actual field installation before final sign-off.

Start free practice for ASTTBC RFPT — Fire Alarm Systems (AL)

30 questions · no signup required · 40 free questions per day

Start Practice →

More about ASTTBC RFPT — Fire Alarm Systems (AL)

Related Questions

More for ASTTBC RFPT — Fire Alarm Systems (AL) candidates

Ready to practice?

Free, no signup required. Build a wrong-question list as you go.

Start Free ASTTBC RFPT — Fire Alarm Systems (AL) Practice →

Related courses

Other Canadian certifications candidates often prepare for alongside this one.