Skip to main content

ASTTBC RFPT — Fire Alarm Systems (AL) · Question

During a building renovation, a new transponder is added to an existing distributed system. What must be verified?

When a transponder is added, the new unit plus the link and its interaction with the master control unit must be verified.

Start free practice for ASTTBC RFPT — Fire Alarm Systems (AL)

30 questions · no signup required · 40 free questions per day

Start Practice →

Question: During a building renovation, a new transponder is added to an existing distributed system. What must be verified?

Answer options:

  • Only the new devices connected to that transponder ✅ The new transponder, its communication link, and all new field devices
  • The entire building system from scratch
  • The power supply of the new transponder only

Correct answer: The new transponder, its communication link, and all new field devices

Explanation: When a transponder is added, the new unit plus the link and its interaction with the master control unit must be verified.

Start free practice for ASTTBC RFPT — Fire Alarm Systems (AL)

30 questions · no signup required · 40 free questions per day

Start Practice →

More about ASTTBC RFPT — Fire Alarm Systems (AL)

Related Questions

More for ASTTBC RFPT — Fire Alarm Systems (AL) candidates

Ready to practice?

Free, no signup required. Build a wrong-question list as you go.

Start Free ASTTBC RFPT — Fire Alarm Systems (AL) Practice →

Related courses

Other Canadian certifications candidates often prepare for alongside this one.