Skip to main content

ASTTBC RFPT — Fire Alarm Systems (AL) · Question

How is a manual pull station functionally tested during an annual inspection?

Section 5.7.1.1 requires each manual station to be operated to ensure it initiates an alarm. Metal keys or break-glass tools are used to reset.

Start free practice for ASTTBC RFPT — Fire Alarm Systems (AL)

30 questions · no signup required · 40 free questions per day

Start Practice →

Question: How is a manual pull station functionally tested during an annual inspection?

Answer options:

  • Visual inspection only ✅ Physical operation of the device
  • Measuring the contact resistance
  • Checking the serial number against the records

Correct answer: Physical operation of the device

Explanation: Section 5.7.1.1 requires each manual station to be operated to ensure it initiates an alarm. Metal keys or break-glass tools are used to reset.

Start free practice for ASTTBC RFPT — Fire Alarm Systems (AL)

30 questions · no signup required · 40 free questions per day

Start Practice →

More about ASTTBC RFPT — Fire Alarm Systems (AL)

Related Questions

More for ASTTBC RFPT — Fire Alarm Systems (AL) candidates

Ready to practice?

Free, no signup required. Build a wrong-question list as you go.

Start Free ASTTBC RFPT — Fire Alarm Systems (AL) Practice →

Related courses

Other Canadian certifications candidates often prepare for alongside this one.