ASTTBC RFPT — Fire Alarm Systems (AL) · Question

When performing a battery load test, the battery must be tested:

The load test must be done with the charging circuit disconnected to ensure the battery alone can handle the system load.

Start free practice for ASTTBC RFPT — Fire Alarm Systems (AL)

30 questions · no signup required · 40 free questions per day

Start Practice →

Question: When performing a battery load test, the battery must be tested:

Answer options:

  • While the battery is disconnected from the panel
  • While the AC power is on and charging
  • Using a 100-ohm resistor only ✅ With the AC power disconnected from the FACP

Correct answer: With the AC power disconnected from the FACP

Explanation: The load test must be done with the charging circuit disconnected to ensure the battery alone can handle the system load.

Start free practice for ASTTBC RFPT — Fire Alarm Systems (AL)

30 questions · no signup required · 40 free questions per day

Start Practice →

More about ASTTBC RFPT — Fire Alarm Systems (AL)

Related Questions

More for ASTTBC RFPT — Fire Alarm Systems (AL) candidates

Ready to practice?

Free, no signup required. Build a wrong-question list as you go.

Start Free ASTTBC RFPT — Fire Alarm Systems (AL) Practice →

Related courses

Other Canadian certifications candidates often prepare for alongside this one.