Skip to main content

RFPT Sprinkler Systems (SP) · Question

While performing field work, which action correctly applies as-built drawing requirements per NFPA 13 §28 (scenario variant 12)?

Per NFPA 25 §5.4.1.1 (annual) / NFPA 13 §8.6 (spacing), as-built drawing requirements per NFPA 13 §28 governs the correct procedure. Distractors omit or contrad

Start free practice for RFPT Sprinkler Systems (SP)

250 questions · no signup required · 40 free questions per day

Start Practice →

Question: While performing field work, which action correctly applies as-built drawing requirements per NFPA 13 §28 (scenario variant 12)?

Answer options:

  • Apply manufacturer marketing literature instead of the code for as-built drawing requirements per NFPA 13 §28 (scenario variant 12) ✅ The requirement defined for as-built drawing requirements per NFPA 13 §28 (scenario variant 12) is met and recorded on the ITM report
  • Treat any anomaly in as-built drawing requirements per NFPA 13 §28 (scenario variant 12) as a non-deficiency regardless of severity
  • Defer all action on as-built drawing requirements per NFPA 13 §28 (scenario variant 12) to the next annual inspection without notification

Correct answer: The requirement defined for as-built drawing requirements per NFPA 13 §28 (scenario variant 12) is met and recorded on the ITM report

Explanation: Per NFPA 25 §5.4.1.1 (annual) / NFPA 13 §8.6 (spacing), as-built drawing requirements per NFPA 13 §28 governs the correct procedure. Distractors omit or contradict the standard.

Start free practice for RFPT Sprinkler Systems (SP)

250 questions · no signup required · 40 free questions per day

Start Practice →

More about RFPT Sprinkler Systems (SP)

Related Questions

More for RFPT Sprinkler Systems (SP) candidates

Ready to practice?

Free, no signup required. Build a wrong-question list as you go.

Start Free RFPT Sprinkler Systems (SP) Practice →

Related courses

Other Canadian certifications candidates often prepare for alongside this one.