A crane operator is setting up a mobile crane to lift a 2,500 kg load. The crane's load chart indicates a maximum capacity of 3,000 kg at the planned radius and boom angle for this specific lift. Which of the following is the most important factor for the operator to consider before proceeding with the lift according to CSA Z150?
According to CSA Z150, ensuring proper ground conditions and stability for the outriggers is paramount to prevent crane overturning, even if the load is within
Start free practice for Crane Operator Certification Exam Prep
404 questions · no signup required · 40 free questions per day
Question: A crane operator is setting up a mobile crane to lift a 2,500 kg load. The crane's load chart indicates a maximum capacity of 3,000 kg at the planned radius and boom angle for this specific lift. Which of the following is the most important factor for the operator to consider before proceeding with the lift according to CSA Z150?
Answer options: ✅ The ground conditions and stability under the outriggers.
- The colour of the load's rigging slings.
- The crane's annual inspection date.
- The operator's personal protective equipment (PPE) for the day.
Correct answer: The ground conditions and stability under the outriggers.
Explanation: According to CSA Z150, ensuring proper ground conditions and stability for the outriggers is paramount to prevent crane overturning, even if the load is within the crane's rated capacity. While other factors like annual inspection and PPE are important, stability is directly related to the safety of the lift itself.
Start free practice for Crane Operator Certification Exam Prep
404 questions · no signup required · 40 free questions per day
More about Crane Operator Certification Exam Prep
Related Questions
- According to most Canadian provincial regulations, who is ultimately responsible for the safe operation of a c
- A crane's rated capacity decreases as the load radius:
- What is the minimum number of full wraps of wire rope that must remain on a hoist drum when the hook is in its
- Before setting up a mobile crane, what is the most important factor to assess regarding ground conditions?
- What is the purpose of an anti-two-block device on a crane?
- Why is it important to keep the load as close to the ground as possible when moving it with a crane?
More for Crane Operator Certification Exam Prep candidates
Question explanations
- According to most Canadian provincial regulations, who is ultimately responsible for the safe operation of a c
- A crane's rated capacity decreases as the load radius:
- What is the minimum number of full wraps of wire rope that must remain on a hoist drum when the hook is in its
- Before setting up a mobile crane, what is the most important factor to assess regarding ground conditions?
Ready to practice?
Free, no signup required. Build a wrong-question list as you go.
Start Free Crane Operator Certification Exam Prep Practice →Related courses
Other Canadian certifications candidates often prepare for alongside this one.