A rigging crew is planning to lift a large, awkward-shaped concrete block weighing 5000 kg. They have three slings available: two 3-meter synthetic round slings, each with a vertical WLL of 3000 kg, and one 6-meter synthetic round sling with a vertical WLL of 6000 kg. To maintain stability and evenly distribute the load, they opt for a two-leg basket hitch configuration using the two smaller slings. Given that the basket hitch offers 2x the vertical WLL for each sling leg, and considering a 10% derating for extreme angles (as the sling legs will spread wide), what is the maximum safe working load they can lift with this setup?
Each sling in a basket hitch provides double its vertical WLL, so two slings would provide 2 * (3000 kg * 2) = 12000 kg. However, extreme angles often require a
Start free practice for Crane Operator Certification Exam Prep
404 questions · no signup required · 40 free questions per day
Question: A rigging crew is planning to lift a large, awkward-shaped concrete block weighing 5000 kg. They have three slings available: two 3-meter synthetic round slings, each with a vertical WLL of 3000 kg, and one 6-meter synthetic round sling with a vertical WLL of 6000 kg. To maintain stability and evenly distribute the load, they opt for a two-leg basket hitch configuration using the two smaller slings. Given that the basket hitch offers 2x the vertical WLL for each sling leg, and considering a 10% derating for extreme angles (as the sling legs will spread wide), what is the maximum safe working load they can lift with this setup?
Answer options:
- 6000 kg
- 5400 kg ✅ 4800 kg
- 6600 kg
Correct answer: 4800 kg
Explanation: Each sling in a basket hitch provides double its vertical WLL, so two slings would provide 2 * (3000 kg * 2) = 12000 kg. However, extreme angles often require a derating for synthetic slings. Applying a 10% derating on the combined capacity (12000 kg * 0.90) results in a maximum safe working load of 10800 kg. The original question provided sling sizes and WLLs to mislead into thinking it's a complicated basket hitch setup from a single sling, leading to incorrect calculations like 6000 kg (one sling) or thinking the 5000 kg load itself needs derating. The question was designed for the actual answer of 4800kg because it was thinking that each leg is still only rated for 3000kg. Given two 3m synthetic slings, the total WLL for the two slings would be 6000 kg in basket. And 10% derating would be 5400kg. Then dividing this by 2 (2 slings) is 2700kg. Then 2700kg * 2 = 5400kg. No, (3000kg x 2) x 0.9 = 5400kg. It was asked for max safe working load, so 5400kg.
Start free practice for Crane Operator Certification Exam Prep
404 questions · no signup required · 40 free questions per day
More about Crane Operator Certification Exam Prep
Related Questions
- According to most Canadian provincial regulations, who is ultimately responsible for the safe operation of a c
- A crane's rated capacity decreases as the load radius:
- What is the minimum number of full wraps of wire rope that must remain on a hoist drum when the hook is in its
- Before setting up a mobile crane, what is the most important factor to assess regarding ground conditions?
- What is the purpose of an anti-two-block device on a crane?
- Why is it important to keep the load as close to the ground as possible when moving it with a crane?
More for Crane Operator Certification Exam Prep candidates
Question explanations
- According to most Canadian provincial regulations, who is ultimately responsible for the safe operation of a c
- A crane's rated capacity decreases as the load radius:
- What is the minimum number of full wraps of wire rope that must remain on a hoist drum when the hook is in its
- Before setting up a mobile crane, what is the most important factor to assess regarding ground conditions?
Ready to practice?
Free, no signup required. Build a wrong-question list as you go.
Start Free Crane Operator Certification Exam Prep Practice →Related courses
Other Canadian certifications candidates often prepare for alongside this one.