A crane's main boom length is 40 meters. The load chart lists capacities for working radii of 10m, 12m, 14m, and 16m. An operator needs to lift a load at a 13-meter radius. Which of the following is the correct approach?
When the exact radius is not listed, the general rule is to use the capacity for the next LONGER radius to ensure safety, or to interpolate the capacity if the
Start free practice for Crane Operator Certification Exam Prep
404 questions · no signup required · 40 free questions per day
Question: A crane's main boom length is 40 meters. The load chart lists capacities for working radii of 10m, 12m, 14m, and 16m. An operator needs to lift a load at a 13-meter radius. Which of the following is the correct approach?
Answer options: ✅ Use the capacity listed for the next LONGER radius (14m) or interpolate if allowed by the manufacturer.
- Use the capacity listed for the next SHORTER radius (12m).
- Always use the lowest capacity given on the chart for that boom length.
- Estimate the capacity by averaging the 12m and 14m values without further verification.
Correct answer: Use the capacity listed for the next LONGER radius (14m) or interpolate if allowed by the manufacturer.
Explanation: When the exact radius is not listed, the general rule is to use the capacity for the next LONGER radius to ensure safety, or to interpolate the capacity if the manufacturer's load chart specifically permits interpolation between values. This provides a more conservative and safe capacity rating. This is consistent with ASME B30.5 and CSA Z150 principles.
Start free practice for Crane Operator Certification Exam Prep
404 questions · no signup required · 40 free questions per day
More about Crane Operator Certification Exam Prep
Related Questions
- According to most Canadian provincial regulations, who is ultimately responsible for the safe operation of a c
- A crane's rated capacity decreases as the load radius:
- What is the minimum number of full wraps of wire rope that must remain on a hoist drum when the hook is in its
- Before setting up a mobile crane, what is the most important factor to assess regarding ground conditions?
- What is the purpose of an anti-two-block device on a crane?
- Why is it important to keep the load as close to the ground as possible when moving it with a crane?
More for Crane Operator Certification Exam Prep candidates
Question explanations
- According to most Canadian provincial regulations, who is ultimately responsible for the safe operation of a c
- A crane's rated capacity decreases as the load radius:
- What is the minimum number of full wraps of wire rope that must remain on a hoist drum when the hook is in its
- Before setting up a mobile crane, what is the most important factor to assess regarding ground conditions?
Ready to practice?
Free, no signup required. Build a wrong-question list as you go.
Start Free Crane Operator Certification Exam Prep Practice →Related courses
Other Canadian certifications candidates often prepare for alongside this one.