During a pre-lift planning meeting, it is determined that one outrigger will be set up over a soft spot in the ground. What is the immediate correct action regarding the load chart?
A soft spot beneath an outrigger can lead to uneven settlement, reducing the crane's stability and thus its actual lifting capacity. A responsible lift plan req
Start free practice for Crane Operator Certification Exam Prep
404 questions · no signup required · 40 free questions per day
Question: During a pre-lift planning meeting, it is determined that one outrigger will be set up over a soft spot in the ground. What is the immediate correct action regarding the load chart?
Answer options: ✅ The crane's capacity must be reduced, and a matting plan developed to ensure ground bearing pressure is within limits.
- The outrigger capacity for that corner increases, so no adjustment to the chart is needed.
- The lift can proceed as planned if the other three outriggers are on firm ground.
- Only the allowable ground bearing pressure for that specific outrigger needs to be checked, not the load chart.
Correct answer: The crane's capacity must be reduced, and a matting plan developed to ensure ground bearing pressure is within limits.
Explanation: A soft spot beneath an outrigger can lead to uneven settlement, reducing the crane's stability and thus its actual lifting capacity. A responsible lift plan requires strengthening the ground (matting) and potentially reducing the crane's capacity or adjusting the setup to ensure safety and stability, in accordance with Provincial OHS regulations and CSA Z150 requirements on supporting surface integrity.
Start free practice for Crane Operator Certification Exam Prep
404 questions · no signup required · 40 free questions per day
More about Crane Operator Certification Exam Prep
Related Questions
- According to most Canadian provincial regulations, who is ultimately responsible for the safe operation of a c
- A crane's rated capacity decreases as the load radius:
- What is the minimum number of full wraps of wire rope that must remain on a hoist drum when the hook is in its
- Before setting up a mobile crane, what is the most important factor to assess regarding ground conditions?
- What is the purpose of an anti-two-block device on a crane?
- Why is it important to keep the load as close to the ground as possible when moving it with a crane?
More for Crane Operator Certification Exam Prep candidates
Question explanations
- According to most Canadian provincial regulations, who is ultimately responsible for the safe operation of a c
- A crane's rated capacity decreases as the load radius:
- What is the minimum number of full wraps of wire rope that must remain on a hoist drum when the hook is in its
- Before setting up a mobile crane, what is the most important factor to assess regarding ground conditions?
Ready to practice?
Free, no signup required. Build a wrong-question list as you go.
Start Free Crane Operator Certification Exam Prep Practice →Related courses
Other Canadian certifications candidates often prepare for alongside this one.