Crane Operator Certification Exam Prep · Question
An operator must lift a 12,500 kg load. The load chart for the selected boom length and radius shows a gross capacity of 14,000 kg. The rigging plan accounts for a 500 kg hook block and a 150 kg headache ball. There are also specialized spreader bars and slings weighing a total of 700 kg. What is the net lifting capacity available for the load?
All items hanging below the boom point (hook block, headache ball, spreader bars, slings) are deductions that must be subtracted from the gross capacity to dete
Start free practice for Crane Operator Certification Exam Prep
404 questions · no signup required · 40 free questions per day
Question: An operator must lift a 12,500 kg load. The load chart for the selected boom length and radius shows a gross capacity of 14,000 kg. The rigging plan accounts for a 500 kg hook block and a 150 kg headache ball. There are also specialized spreader bars and slings weighing a total of 700 kg. What is the net lifting capacity available for the load?
Answer options: ✅ 12,650 kg
- 12,000 kg
- 14,000 kg
- 13,300 kg
Correct answer: 12,650 kg
Explanation: All items hanging below the boom point (hook block, headache ball, spreader bars, slings) are deductions that must be subtracted from the gross capacity to determine the net capacity available for the load. Total deductions = 500 kg + 150 kg + 700 kg = 1,350 kg. Net capacity = Gross Capacity - Total Deductions = 14,000 kg - 1,350 kg = 12,650 kg. The load of 12,500 kg is within this net capacity. This is a common and important calculation required by CSA Z150.
Start free practice for Crane Operator Certification Exam Prep
404 questions · no signup required · 40 free questions per day
More about Crane Operator Certification Exam Prep
Related Questions
- According to most Canadian provincial regulations, who is ultimately responsible for the safe operation of a c
- A crane's rated capacity decreases as the load radius:
- What is the minimum number of full wraps of wire rope that must remain on a hoist drum when the hook is in its
- Before setting up a mobile crane, what is the most important factor to assess regarding ground conditions?
- What is the purpose of an anti-two-block device on a crane?
- Why is it important to keep the load as close to the ground as possible when moving it with a crane?
More for Crane Operator Certification Exam Prep candidates
Question explanations
- According to most Canadian provincial regulations, who is ultimately responsible for the safe operation of a c
- A crane's rated capacity decreases as the load radius:
- What is the minimum number of full wraps of wire rope that must remain on a hoist drum when the hook is in its
- Before setting up a mobile crane, what is the most important factor to assess regarding ground conditions?
Ready to practice?
Free, no signup required. Build a wrong-question list as you go.
Start Free Crane Operator Certification Exam Prep Practice →Related courses
Other Canadian certifications candidates often prepare for alongside this one.