A wind gauge 50 metres from a crane shows a steady 30 km/h wind. The load is a large, flat panel with significant surface area. The site safety plan specifies a maximum wind speed of 40 km/h. What must the crane operator consider beyond the measured wind speed given the load type?
Loads with large surface areas, often called 'sail area,' are highly susceptible to wind forces. Even if measured wind speeds are below limits, the effective fo
Start free practice for Crane Operator Certification Exam Prep
404 questions · no signup required · 40 free questions per day
Question: A wind gauge 50 metres from a crane shows a steady 30 km/h wind. The load is a large, flat panel with significant surface area. The site safety plan specifies a maximum wind speed of 40 km/h. What must the crane operator consider beyond the measured wind speed given the load type?
Answer options: ✅ The sail area of the load will effectively increase the force exerted by the wind, potentially exceeding safe limits.
- The wind speed at the load's height could be significantly lower than at ground level.
- Flat panels are inherently more stable in wind, so the limit could be relaxed.
- The crane's counterweight should be reduced to improve stability in wind.
Correct answer: The sail area of the load will effectively increase the force exerted by the wind, potentially exceeding safe limits.
Explanation: Loads with large surface areas, often called 'sail area,' are highly susceptible to wind forces. Even if measured wind speeds are below limits, the effective force on such loads can be much greater, increasing the risk of instability, load swing, and loss of control.
Start free practice for Crane Operator Certification Exam Prep
404 questions · no signup required · 40 free questions per day
More about Crane Operator Certification Exam Prep
Related Questions
- According to most Canadian provincial regulations, who is ultimately responsible for the safe operation of a c
- A crane's rated capacity decreases as the load radius:
- What is the minimum number of full wraps of wire rope that must remain on a hoist drum when the hook is in its
- Before setting up a mobile crane, what is the most important factor to assess regarding ground conditions?
- What is the purpose of an anti-two-block device on a crane?
- Why is it important to keep the load as close to the ground as possible when moving it with a crane?
More for Crane Operator Certification Exam Prep candidates
Question explanations
- According to most Canadian provincial regulations, who is ultimately responsible for the safe operation of a c
- A crane's rated capacity decreases as the load radius:
- What is the minimum number of full wraps of wire rope that must remain on a hoist drum when the hook is in its
- Before setting up a mobile crane, what is the most important factor to assess regarding ground conditions?
Ready to practice?
Free, no signup required. Build a wrong-question list as you go.
Start Free Crane Operator Certification Exam Prep Practice →Related courses
Other Canadian certifications candidates often prepare for alongside this one.