A self-erecting tower crane's maximum free-standing height as per the manufacturer's charts is 35 m. During erection, at what height above the crane's base must the first tie-in connection be made if the crane is operating in an exposed, high-wind zone?
CSA Z248 requires that tower crane tie-ins begin when the crane approaches its free-standing height limit, often specified by manufacturer's charts for particul
Start free practice for Crane Operator Certification Exam Prep
404 questions · no signup required · 40 free questions per day
Question: A self-erecting tower crane's maximum free-standing height as per the manufacturer's charts is 35 m. During erection, at what height above the crane's base must the first tie-in connection be made if the crane is operating in an exposed, high-wind zone?
Answer options: ✅ Typically between 2/3 and 3/4 of the maximum free-standing height, or as per the manufacturer's specific wind zone charts.
- Exactly 35 m, as this is the maximum allowable without ties.
- At 1/2 of the planned operational height, regardless of free-standing limit.
- Below 15 m to ensure stability during initial stages.
Correct answer: Typically between 2/3 and 3/4 of the maximum free-standing height, or as per the manufacturer's specific wind zone charts.
Explanation: CSA Z248 requires that tower crane tie-ins begin when the crane approaches its free-standing height limit, often specified by manufacturer's charts for particular wind zones. This is typically done at 2/3 to 3/4 of the maximum free-standing height to maintain structural integrity and account for dynamic loads and wind forces before reaching the absolute limit.
Start free practice for Crane Operator Certification Exam Prep
404 questions · no signup required · 40 free questions per day
More about Crane Operator Certification Exam Prep
Related Questions
- According to most Canadian provincial regulations, who is ultimately responsible for the safe operation of a c
- A crane's rated capacity decreases as the load radius:
- What is the minimum number of full wraps of wire rope that must remain on a hoist drum when the hook is in its
- Before setting up a mobile crane, what is the most important factor to assess regarding ground conditions?
- What is the purpose of an anti-two-block device on a crane?
- Why is it important to keep the load as close to the ground as possible when moving it with a crane?
More for Crane Operator Certification Exam Prep candidates
Question explanations
- According to most Canadian provincial regulations, who is ultimately responsible for the safe operation of a c
- A crane's rated capacity decreases as the load radius:
- What is the minimum number of full wraps of wire rope that must remain on a hoist drum when the hook is in its
- Before setting up a mobile crane, what is the most important factor to assess regarding ground conditions?
Ready to practice?
Free, no signup required. Build a wrong-question list as you go.
Start Free Crane Operator Certification Exam Prep Practice →Related courses
Other Canadian certifications candidates often prepare for alongside this one.