A construction project mandates that a tower crane maintain a minimum 3.0 m clearance from an adjacent overhead power line, which is located in a fixed position. The crane's current slewing limit is 360 degrees. To comply with this regulation (e.g., Ontario O. Reg 213/91, Section 183), what is the most appropriate action for safe operation near the power line?
Implementing a programmatic slewing limit directly into the crane's control system is the most effective and reliable method to ensure the 3.0 m minimum clearan
Start free practice for Crane Operator Certification Exam Prep
404 questions · no signup required · 40 free questions per day
Question: A construction project mandates that a tower crane maintain a minimum 3.0 m clearance from an adjacent overhead power line, which is located in a fixed position. The crane's current slewing limit is 360 degrees. To comply with this regulation (e.g., Ontario O. Reg 213/91, Section 183), what is the most appropriate action for safe operation near the power line?
Answer options: ✅ Implement a programmatic slewing limit zone in the crane's control system, restricting rotation to prevent encroachment.
- Train the operator to visually estimate the clearance and stop before encroachment.
- Mark the ground with yellow paint to indicate the hazard area.
- Assign a dedicated signal person to constantly monitor the clearance.
Correct answer: Implement a programmatic slewing limit zone in the crane's control system, restricting rotation to prevent encroachment.
Explanation: Implementing a programmatic slewing limit directly into the crane's control system is the most effective and reliable method to ensure the 3.0 m minimum clearance is always maintained and cannot be accidentally breached. This provides a hard stop and is often a regulatory requirement (e.g., Ontario O. Reg 213/91, Section 183) for permanent prevention, rather than relying solely on human vigilance.
Start free practice for Crane Operator Certification Exam Prep
404 questions · no signup required · 40 free questions per day
More about Crane Operator Certification Exam Prep
Related Questions
- According to most Canadian provincial regulations, who is ultimately responsible for the safe operation of a c
- A crane's rated capacity decreases as the load radius:
- What is the minimum number of full wraps of wire rope that must remain on a hoist drum when the hook is in its
- Before setting up a mobile crane, what is the most important factor to assess regarding ground conditions?
- What is the purpose of an anti-two-block device on a crane?
- Why is it important to keep the load as close to the ground as possible when moving it with a crane?
More for Crane Operator Certification Exam Prep candidates
Question explanations
- According to most Canadian provincial regulations, who is ultimately responsible for the safe operation of a c
- A crane's rated capacity decreases as the load radius:
- What is the minimum number of full wraps of wire rope that must remain on a hoist drum when the hook is in its
- Before setting up a mobile crane, what is the most important factor to assess regarding ground conditions?
Ready to practice?
Free, no signup required. Build a wrong-question list as you go.
Start Free Crane Operator Certification Exam Prep Practice →Related courses
Other Canadian certifications candidates often prepare for alongside this one.