An operator identifies an active hydraulic leak from the main boom extend cylinder during a pre-shift inspection. Alberta OHS Code Part 21 requires what specific action?
Alberta OHS Code Part 21 states that if a defect is found that may compromise safe operation, the crane must be removed from service immediately. This involves
Start free practice for Crane Operator Certification Exam Prep
404 questions · no signup required · 40 free questions per day
Question: An operator identifies an active hydraulic leak from the main boom extend cylinder during a pre-shift inspection. Alberta OHS Code Part 21 requires what specific action?
Answer options: ✅ The operator must immediately notify a supervisor and clearly tag the crane 'Out of Service' or 'Do Not Operate'.
- The operator should attempt to tighten the leaking fitting with tools available in the cab.
- The crane can be used for non-critical lifts until maintenance arrives later in the day.
- A note should be made in the logbook, and the leak monitored during initial operations.
Correct answer: The operator must immediately notify a supervisor and clearly tag the crane 'Out of Service' or 'Do Not Operate'.
Explanation: Alberta OHS Code Part 21 states that if a defect is found that may compromise safe operation, the crane must be removed from service immediately. This involves notifying a supervisor and clearly tagging the equipment to prevent its use until repaired.
Start free practice for Crane Operator Certification Exam Prep
404 questions · no signup required · 40 free questions per day
More about Crane Operator Certification Exam Prep
Related Questions
- According to most Canadian provincial regulations, who is ultimately responsible for the safe operation of a c
- A crane's rated capacity decreases as the load radius:
- What is the minimum number of full wraps of wire rope that must remain on a hoist drum when the hook is in its
- Before setting up a mobile crane, what is the most important factor to assess regarding ground conditions?
- What is the purpose of an anti-two-block device on a crane?
- Why is it important to keep the load as close to the ground as possible when moving it with a crane?
More for Crane Operator Certification Exam Prep candidates
Question explanations
- According to most Canadian provincial regulations, who is ultimately responsible for the safe operation of a c
- A crane's rated capacity decreases as the load radius:
- What is the minimum number of full wraps of wire rope that must remain on a hoist drum when the hook is in its
- Before setting up a mobile crane, what is the most important factor to assess regarding ground conditions?
Ready to practice?
Free, no signup required. Build a wrong-question list as you go.
Start Free Crane Operator Certification Exam Prep Practice →Related courses
Other Canadian certifications candidates often prepare for alongside this one.