A crane with a maximum main boom length of 30 metres (100 feet) is equipped with a two-block warning system. The operator is lifting a 2-tonne (4,400 lb) pre-cast concrete panel. If the two-block warning alarm sounds intermittently during the lift, what immediate action should the operator take?
A two-block warning system indicates that the load block is dangerously close to the boom tip sheave, posing a risk of severe damage to the hoist rope or boom.
Start free practice for Crane Operator Certification Exam Prep
404 questions · no signup required · 40 free questions per day
Question: A crane with a maximum main boom length of 30 metres (100 feet) is equipped with a two-block warning system. The operator is lifting a 2-tonne (4,400 lb) pre-cast concrete panel. If the two-block warning alarm sounds intermittently during the lift, what immediate action should the operator take?
Answer options:
- Speed up the hoisting operation to clear the obstruction quickly.
- Lower the boom slightly to increase the distance to the sheave. ✅ Stop hoisting operations and investigate the cause of the alarm.
- Retract the boom to shorten its length, then resume hoisting.
Correct answer: Stop hoisting operations and investigate the cause of the alarm.
Explanation: A two-block warning system indicates that the load block is dangerously close to the boom tip sheave, posing a risk of severe damage to the hoist rope or boom. The immediate and correct action is to stop all hoisting and booming in operations and investigate the cause of the alarm to prevent two-blocking, which can lead to rope failure or structural damage.
Start free practice for Crane Operator Certification Exam Prep
404 questions · no signup required · 40 free questions per day
More about Crane Operator Certification Exam Prep
Related Questions
- According to most Canadian provincial regulations, who is ultimately responsible for the safe operation of a c
- A crane's rated capacity decreases as the load radius:
- What is the minimum number of full wraps of wire rope that must remain on a hoist drum when the hook is in its
- Before setting up a mobile crane, what is the most important factor to assess regarding ground conditions?
- What is the purpose of an anti-two-block device on a crane?
- Why is it important to keep the load as close to the ground as possible when moving it with a crane?
More for Crane Operator Certification Exam Prep candidates
Question explanations
- According to most Canadian provincial regulations, who is ultimately responsible for the safe operation of a c
- A crane's rated capacity decreases as the load radius:
- What is the minimum number of full wraps of wire rope that must remain on a hoist drum when the hook is in its
- Before setting up a mobile crane, what is the most important factor to assess regarding ground conditions?
Ready to practice?
Free, no signup required. Build a wrong-question list as you go.
Start Free Crane Operator Certification Exam Prep Practice →Related courses
Other Canadian certifications candidates often prepare for alongside this one.