During the assembly or disassembly of a tower crane, what is the primary role of the erector director?
The erector director (or competent person responsible for assembly/disassembly) must be present on site and directly supervise all aspects of tower crane assemb
Start free practice for Crane Operator Certification Exam Prep
404 questions · no signup required · 40 free questions per day
Question: During the assembly or disassembly of a tower crane, what is the primary role of the erector director?
Answer options:
- To operate the crane during assembly
- To manage all financial transactions for the assembly ✅ To be present at the site and direct all operations for erecting, climbing, and dismantling the crane
- To perform structural welding on the crane components
Correct answer: To be present at the site and direct all operations for erecting, climbing, and dismantling the crane
Explanation: The erector director (or competent person responsible for assembly/disassembly) must be present on site and directly supervise all aspects of tower crane assembly, climbing, and dismantling, as per CSA Z248 requirements.
Start free practice for Crane Operator Certification Exam Prep
404 questions · no signup required · 40 free questions per day
More about Crane Operator Certification Exam Prep
Related Questions
- According to most Canadian provincial regulations, who is ultimately responsible for the safe operation of a c
- A crane's rated capacity decreases as the load radius:
- What is the minimum number of full wraps of wire rope that must remain on a hoist drum when the hook is in its
- Before setting up a mobile crane, what is the most important factor to assess regarding ground conditions?
- What is the purpose of an anti-two-block device on a crane?
- Why is it important to keep the load as close to the ground as possible when moving it with a crane?
More for Crane Operator Certification Exam Prep candidates
Question explanations
- According to most Canadian provincial regulations, who is ultimately responsible for the safe operation of a c
- A crane's rated capacity decreases as the load radius:
- What is the minimum number of full wraps of wire rope that must remain on a hoist drum when the hook is in its
- Before setting up a mobile crane, what is the most important factor to assess regarding ground conditions?
Ready to practice?
Free, no signup required. Build a wrong-question list as you go.
Start Free Crane Operator Certification Exam Prep Practice →Related courses
Other Canadian certifications candidates often prepare for alongside this one.