When can a mobile crane travel with a suspended load on a construction site?
Mobile crane travel with a suspended load (pick and carry) is permissible only under specific conditions, explicitly approved by a qualified person after ground
Start free practice for Crane Operator Certification Exam Prep
404 questions · no signup required · 40 free questions per day
Question: When can a mobile crane travel with a suspended load on a construction site?
Answer options:
- At any time, as long as the load is secured with tag lines. ✅ Only if explicitly approved by a qualified person, assessed for ground conditions, and within manufacturer's limits for pick and carry operations.
- Never, as it is always prohibited.
- Only if the load is less than half the crane's maximum capacity.
Correct answer: Only if explicitly approved by a qualified person, assessed for ground conditions, and within manufacturer's limits for pick and carry operations.
Explanation: Mobile crane travel with a suspended load (pick and carry) is permissible only under specific conditions, explicitly approved by a qualified person after ground condition assessment, and strictly within the crane manufacturer's designated limits.
Start free practice for Crane Operator Certification Exam Prep
404 questions · no signup required · 40 free questions per day
More about Crane Operator Certification Exam Prep
Related Questions
- According to most Canadian provincial regulations, who is ultimately responsible for the safe operation of a c
- A crane's rated capacity decreases as the load radius:
- What is the minimum number of full wraps of wire rope that must remain on a hoist drum when the hook is in its
- Before setting up a mobile crane, what is the most important factor to assess regarding ground conditions?
- What is the purpose of an anti-two-block device on a crane?
- Why is it important to keep the load as close to the ground as possible when moving it with a crane?
More for Crane Operator Certification Exam Prep candidates
Question explanations
- According to most Canadian provincial regulations, who is ultimately responsible for the safe operation of a c
- A crane's rated capacity decreases as the load radius:
- What is the minimum number of full wraps of wire rope that must remain on a hoist drum when the hook is in its
- Before setting up a mobile crane, what is the most important factor to assess regarding ground conditions?
Ready to practice?
Free, no signup required. Build a wrong-question list as you go.
Start Free Crane Operator Certification Exam Prep Practice →Related courses
Other Canadian certifications candidates often prepare for alongside this one.