Skip to main content

Excavator Operator Certification Exam Prep · Question

An excavator is trenching for a new water line with a maximum depth of 2.5 metres. According to Ontario O. Reg. 213/91, what is the minimum required distance from the edge of the trench that excavated material (spoil pile) must be placed?

Ontario O. Reg. 213/91, Section 228 (1) states that excavated material shall be kept at least 1 metre from the edge of the trench. This mitigates surcharge load

Start free practice for Excavator Operator Certification Exam Prep

263 questions · no signup required · 40 free questions per day

Start Practice →

Question: An excavator is trenching for a new water line with a maximum depth of 2.5 metres. According to Ontario O. Reg. 213/91, what is the minimum required distance from the edge of the trench that excavated material (spoil pile) must be placed?

Answer options: ✅ 1.0 metre

  • 0.6 metres
  • 0.5 metres
  • 1.2 metres

Correct answer: 1.0 metre

Explanation: Ontario O. Reg. 213/91, Section 228 (1) states that excavated material shall be kept at least 1 metre from the edge of the trench. This mitigates surcharge loading on the trench wall and prevents material from falling back into the excavation.

Start free practice for Excavator Operator Certification Exam Prep

263 questions · no signup required · 40 free questions per day

Start Practice →

More about Excavator Operator Certification Exam Prep

Related Questions

More for Excavator Operator Certification Exam Prep candidates

Ready to practice?

Free, no signup required. Build a wrong-question list as you go.

Start Free Excavator Operator Certification Exam Prep Practice →

Related courses

Other Canadian certifications candidates often prepare for alongside this one.