You are trenching in cohesive soil with a trench depth of 3.5 metres and a bottom width of 0.8 metres. The soil type requires a minimum slope of 1:1 for stability. What is the minimum required top width of the trench?

For a 1:1 slope, the horizontal distance equals the vertical distance on both sides. So, 3.5 m (depth) x 1 (slope ratio) = 3.5 m on each side. Total top width i

Start free practice for Excavator Operator Certification Exam Prep

263 questions · no signup required · 40 free questions per day

Start Practice →

Question: You are trenching in cohesive soil with a trench depth of 3.5 metres and a bottom width of 0.8 metres. The soil type requires a minimum slope of 1:1 for stability. What is the minimum required top width of the trench?

Answer options:

  • 4.3 metres ✅ 7.8 metres
  • 5.0 metres
  • 3.0 metres

Correct answer: 7.8 metres

Explanation: For a 1:1 slope, the horizontal distance equals the vertical distance on both sides. So, 3.5 m (depth) x 1 (slope ratio) = 3.5 m on each side. Total top width is 0.8 m (bottom width) + 3.5 m (left slope) + 3.5 m (right slope) = 7.8 metres. This calculation ensures the trench walls are stable per OHS regulations.

Start free practice for Excavator Operator Certification Exam Prep

263 questions · no signup required · 40 free questions per day

Start Practice →

More about Excavator Operator Certification Exam Prep

Related Questions

More for Excavator Operator Certification Exam Prep candidates

Ready to practice?

Free, no signup required. Build a wrong-question list as you go.

Start Free Excavator Operator Certification Exam Prep Practice →

Related courses

Other Canadian certifications candidates often prepare for alongside this one.