Excavator Operator Certification Exam Prep · Question

An excavator operator is digging a trench in a Type 1 soil. What minimum distance must the spoil pile be kept from the edge of the excavation to prevent collapse, according to general safety guidelines?

OHS regulations across Canada (e.g., Ontario O. Reg. 213/91 Section 232(3)) generally require spoil piles to be kept at a minimum distance of 0.6 metres (2 feet

Start free practice for Excavator Operator Certification Exam Prep

263 questions · no signup required · 40 free questions per day

Start Practice →

Question: An excavator operator is digging a trench in a Type 1 soil. What minimum distance must the spoil pile be kept from the edge of the excavation to prevent collapse, according to general safety guidelines?

Answer options: ✅ 0.5 metres

  • 0.6 metres
  • 1.0 metre
  • 1.2 metres

Correct answer: 0.5 metres

Explanation: OHS regulations across Canada (e.g., Ontario O. Reg. 213/91 Section 232(3)) generally require spoil piles to be kept at a minimum distance of 0.6 metres (2 feet) from the edge of an excavation, regardless of soil type, to prevent added surcharge load.

Start free practice for Excavator Operator Certification Exam Prep

263 questions · no signup required · 40 free questions per day

Start Practice →

More about Excavator Operator Certification Exam Prep

Related Questions

More for Excavator Operator Certification Exam Prep candidates

Ready to practice?

Free, no signup required. Build a wrong-question list as you go.

Start Free Excavator Operator Certification Exam Prep Practice →

Related courses

Other Canadian certifications candidates often prepare for alongside this one.