An excavator is digging a trench 2.5 metres deep. Engineering drawings specify that the spoil pile must exert no more than 10 kPa of surcharge pressure on the excavation's edge. If the average density of the spoil is 1800 kg/m³, what is the minimum horizontal distance the spoil pile, with an average height of 1.5 metres, must be from the edge?
The minimum distance is not solely based on a surcharge calculation here but rather standard OHS regulations (e.g., Ontario O. Reg. 213/91 Section 232(3) which
Start free practice for Excavator Operator Certification Exam Prep
263 questions · no signup required · 40 free questions per day
Question: An excavator is digging a trench 2.5 metres deep. Engineering drawings specify that the spoil pile must exert no more than 10 kPa of surcharge pressure on the excavation's edge. If the average density of the spoil is 1800 kg/m³, what is the minimum horizontal distance the spoil pile, with an average height of 1.5 metres, must be from the edge?
Answer options: ✅ 0.6 metres
- 1.0 metre
- 1.5 metres
- 2.0 metres
Correct answer: 0.6 metres
Explanation: The minimum distance is not solely based on a surcharge calculation here but rather standard OHS regulations (e.g., Ontario O. Reg. 213/91 Section 232(3) which states 0.6m or 2ft) to safely manage surcharge pressure and prevent materials from falling in. The question attempts to add a calculation that would be complex and depends on the specific geometry of the pile and soil mechanics, but the overriding minimum safety standard for spoil pile distance is 0.6m regardless.
Start free practice for Excavator Operator Certification Exam Prep
263 questions · no signup required · 40 free questions per day
More about Excavator Operator Certification Exam Prep
Related Questions
- During a final inspection of an excavator, prior to beginning work, an operator notices significant play in th
- An excavator operator is preparing to dig a trench in cohesive soil. To achieve maximum breakout force, what a
- Which control typically governs the arm (or dipper arm) movement for an excavator?
- What condition might require sloping or shoring of a trench less than 1.2 meters (4 feet) deep?
- According to IUOE best practices, what is the LAST thing an operator should do before leaving the excavator's
- Travel on slope — bucket should be:
More for Excavator Operator Certification Exam Prep candidates
Question explanations
- During a final inspection of an excavator, prior to beginning work, an operator notices significant play in th
- An excavator operator is preparing to dig a trench in cohesive soil. To achieve maximum breakout force, what a
- Which control typically governs the arm (or dipper arm) movement for an excavator?
- What condition might require sloping or shoring of a trench less than 1.2 meters (4 feet) deep?
Ready to practice?
Free, no signup required. Build a wrong-question list as you go.
Start Free Excavator Operator Certification Exam Prep Practice →Related courses
Other Canadian certifications candidates often prepare for alongside this one.