Excavator Operator Certification Exam Prep · Question
You are digging a trench 2.0 metres deep in Type 2 soil. If a simple benching system is to be used, what is the minimum width of the lowest bench for worker entry, and the maximum vertical distance for the lowest cut, according to best practice and OHS guidelines for Type 2 soil?
While exact benching dimensions can vary based on specific engineering, general OHS best practices (e.g., O. Reg. 213/91, Section 233(4)) for Type 2 soil sugges
Start free practice for Excavator Operator Certification Exam Prep
263 questions · no signup required · 40 free questions per day
Question: You are digging a trench 2.0 metres deep in Type 2 soil. If a simple benching system is to be used, what is the minimum width of the lowest bench for worker entry, and the maximum vertical distance for the lowest cut, according to best practice and OHS guidelines for Type 2 soil?
Answer options: ✅ 0.6m wide bench, 1.2m vertical cut
- 0.6m wide bench, 0.9m vertical cut
- 1.0m wide bench, 1.2m vertical cut
- 1.2m wide bench, 1.5m vertical cut
Correct answer: 0.6m wide bench, 1.2m vertical cut
Explanation: While exact benching dimensions can vary based on specific engineering, general OHS best practices (e.g., O. Reg. 213/91, Section 233(4)) for Type 2 soil suggest a maximum vertical cut of 1.2 metres for the lowest part of the benching system if it's then sloped or benched, and a minimum clear working width of 0.6 metres for any bench workers might use.
Start free practice for Excavator Operator Certification Exam Prep
263 questions · no signup required · 40 free questions per day
More about Excavator Operator Certification Exam Prep
Related Questions
- During a final inspection of an excavator, prior to beginning work, an operator notices significant play in th
- An excavator operator is preparing to dig a trench in cohesive soil. To achieve maximum breakout force, what a
- Which control typically governs the arm (or dipper arm) movement for an excavator?
- What condition might require sloping or shoring of a trench less than 1.2 meters (4 feet) deep?
- According to IUOE best practices, what is the LAST thing an operator should do before leaving the excavator's
- Travel on slope — bucket should be:
More for Excavator Operator Certification Exam Prep candidates
Question explanations
- During a final inspection of an excavator, prior to beginning work, an operator notices significant play in th
- An excavator operator is preparing to dig a trench in cohesive soil. To achieve maximum breakout force, what a
- Which control typically governs the arm (or dipper arm) movement for an excavator?
- What condition might require sloping or shoring of a trench less than 1.2 meters (4 feet) deep?
Ready to practice?
Free, no signup required. Build a wrong-question list as you go.
Start Free Excavator Operator Certification Exam Prep Practice →Related courses