An operator is digging a trench in clay soil known to swell significantly when wet. A heavy rainfall is expected overnight. What proactive measure should be taken to mitigate the risk of trench instability or water accumulation for morning work?
Heavy rainfall in swelling clay soil presents a significant hazard for trench stability and accumulation. Proactive measures such as dewatering, additional shor
Start free practice for Excavator Operator Certification Exam Prep
263 questions · no signup required · 40 free questions per day
Question: An operator is digging a trench in clay soil known to swell significantly when wet. A heavy rainfall is expected overnight. What proactive measure should be taken to mitigate the risk of trench instability or water accumulation for morning work?
Answer options:
- Ensure a pump is available on site, but wait until morning to check water levels. ✅ Install proper dewatering systems and consider additional shoring or sloping, covering the trench, or backfilling.
- Cover the trench with plywood sheets to prevent water entry.
- Dig deeper than planned to create a sump for water collection.
Correct answer: Install proper dewatering systems and consider additional shoring or sloping, covering the trench, or backfilling.
Explanation: Heavy rainfall in swelling clay soil presents a significant hazard for trench stability and accumulation. Proactive measures such as dewatering, additional shoring, appropriate sloping, or covering the trench, or backfilling if possible, are essential to meet OHS requirements for excavation stability. Ont. Reg. 213/91, Section 229 specifies measures against water accumulation.
Start free practice for Excavator Operator Certification Exam Prep
263 questions · no signup required · 40 free questions per day
More about Excavator Operator Certification Exam Prep
Related Questions
- During a final inspection of an excavator, prior to beginning work, an operator notices significant play in th
- An excavator operator is preparing to dig a trench in cohesive soil. To achieve maximum breakout force, what a
- Which control typically governs the arm (or dipper arm) movement for an excavator?
- What condition might require sloping or shoring of a trench less than 1.2 meters (4 feet) deep?
- According to IUOE best practices, what is the LAST thing an operator should do before leaving the excavator's
- Travel on slope — bucket should be:
More for Excavator Operator Certification Exam Prep candidates
Question explanations
- During a final inspection of an excavator, prior to beginning work, an operator notices significant play in th
- An excavator operator is preparing to dig a trench in cohesive soil. To achieve maximum breakout force, what a
- Which control typically governs the arm (or dipper arm) movement for an excavator?
- What condition might require sloping or shoring of a trench less than 1.2 meters (4 feet) deep?
Ready to practice?
Free, no signup required. Build a wrong-question list as you go.
Start Free Excavator Operator Certification Exam Prep Practice →Related courses
Other Canadian certifications candidates often prepare for alongside this one.