Excavator Operator Certification Exam Prep · Question

An excavator is trenching for a new sewer line adjacent to an existing, active natural gas pipeline. According to Alberta OHS Code Part 32, what is the minimum safe excavation distance from the identified natural gas pipeline if its exact location is confirmed?

Alberta OHS Code Part 32, Section 445(1)(d) specifies that if the exact location of an underground facility is confirmed and marked, excavation should not be cl

Start free practice for Excavator Operator Certification Exam Prep

263 questions · no signup required · 40 free questions per day

Start Practice →

Question: An excavator is trenching for a new sewer line adjacent to an existing, active natural gas pipeline. According to Alberta OHS Code Part 32, what is the minimum safe excavation distance from the identified natural gas pipeline if its exact location is confirmed?

Answer options: ✅ 0.3 metres (1 foot)

  • 0.6 metres (2 feet)
  • 1.0 metre (3.3 feet)
  • 1.5 metres (5 feet)

Correct answer: 0.3 metres (1 foot)

Explanation: Alberta OHS Code Part 32, Section 445(1)(d) specifies that if the exact location of an underground facility is confirmed and marked, excavation should not be closer than 0.3 metres (1 foot) to the facility. This 'hand-digging zone' protects against striking the line.

Start free practice for Excavator Operator Certification Exam Prep

263 questions · no signup required · 40 free questions per day

Start Practice →

More about Excavator Operator Certification Exam Prep

Related Questions

More for Excavator Operator Certification Exam Prep candidates

Ready to practice?

Free, no signup required. Build a wrong-question list as you go.

Start Free Excavator Operator Certification Exam Prep Practice →

Related courses

Other Canadian certifications candidates often prepare for alongside this one.