Excavator Operator Certification Exam Prep · Question

An excavator operator is tasked with achieving a final grade of +0.5 metres on a granular sub-base for a new parking lot. The current average ground level is -0.1 metres based on the benchmark. What total depth of fill material is required to reach the final grade?

To calculate the required fill, subtract the current ground level from the desired final grade. The desired final grade is +0.5 m, and the current grade is -0.1

Start free practice for Excavator Operator Certification Exam Prep

263 questions · no signup required · 40 free questions per day

Start Practice →

Question: An excavator operator is tasked with achieving a final grade of +0.5 metres on a granular sub-base for a new parking lot. The current average ground level is -0.1 metres based on the benchmark. What total depth of fill material is required to reach the final grade?

Answer options:

  • 0.4 metres
  • 0.5 metres ✅ 0.6 metres
  • 1.0 metres

Correct answer: 0.6 metres

Explanation: To calculate the required fill, subtract the current ground level from the desired final grade. The desired final grade is +0.5 m, and the current grade is -0.1 m. Therefore, +0.5 m - (-0.1 m) = +0.5 m + 0.1 m = 0.6 m of fill is required.

Start free practice for Excavator Operator Certification Exam Prep

263 questions · no signup required · 40 free questions per day

Start Practice →

More about Excavator Operator Certification Exam Prep

Related Questions

More for Excavator Operator Certification Exam Prep candidates

Ready to practice?

Free, no signup required. Build a wrong-question list as you go.

Start Free Excavator Operator Certification Exam Prep Practice →

Related courses

Other Canadian certifications candidates often prepare for alongside this one.