Excavator Operator Certification Exam Prep · Question
A trench for a 300 mm diameter utility pipe needs to be excavated in stable, cohesive soil to a depth of 2.5 metres. The provincial occupational health and safety regulations dictate that any trench deeper than 1.2 metres requires shoring or sloping. What is the minimum slope angle, relative to the horizontal, typically required for stable soil conditions to ensure worker safety without shoring?
For stable, cohesive soil, provincial regulations often allow for a maximum trench side slope of 1:2 (vertical to horizontal), which corresponds to approximatel
Start free practice for Excavator Operator Certification Exam Prep
263 questions · no signup required · 40 free questions per day
Question: A trench for a 300 mm diameter utility pipe needs to be excavated in stable, cohesive soil to a depth of 2.5 metres. The provincial occupational health and safety regulations dictate that any trench deeper than 1.2 metres requires shoring or sloping. What is the minimum slope angle, relative to the horizontal, typically required for stable soil conditions to ensure worker safety without shoring?
Answer options:
- 1:1 (45 degrees) ✅ 1:2 (26.6 degrees)
- 1:0.5 (63.4 degrees)
- 2:1 (63.4 degrees)
Correct answer: 1:2 (26.6 degrees)
Explanation: For stable, cohesive soil, provincial regulations often allow for a maximum trench side slope of 1:2 (vertical to horizontal), which corresponds to approximately 26.6 degrees from the horizontal. A 1:1 slope is typically used for less stable soils or for general trenching guidelines, while steeper slopes like 1:0.5 or 2:1 are generally unsafe without significant shoring.
Start free practice for Excavator Operator Certification Exam Prep
263 questions · no signup required · 40 free questions per day
More about Excavator Operator Certification Exam Prep
Related Questions
- During a final inspection of an excavator, prior to beginning work, an operator notices significant play in th
- An excavator operator is preparing to dig a trench in cohesive soil. To achieve maximum breakout force, what a
- Which control typically governs the arm (or dipper arm) movement for an excavator?
- What condition might require sloping or shoring of a trench less than 1.2 meters (4 feet) deep?
- According to IUOE best practices, what is the LAST thing an operator should do before leaving the excavator's
- Travel on slope — bucket should be:
More for Excavator Operator Certification Exam Prep candidates
Question explanations
- During a final inspection of an excavator, prior to beginning work, an operator notices significant play in th
- An excavator operator is preparing to dig a trench in cohesive soil. To achieve maximum breakout force, what a
- Which control typically governs the arm (or dipper arm) movement for an excavator?
- What condition might require sloping or shoring of a trench less than 1.2 meters (4 feet) deep?
Ready to practice?
Free, no signup required. Build a wrong-question list as you go.
Start Free Excavator Operator Certification Exam Prep Practice →Related courses
Other Canadian certifications candidates often prepare for alongside this one.