A trench is being excavated in cohesive soil to a depth of 2.1 m. What is the minimum slope angle for the sides of the trench, without additional shoring or support, as per Canadian occupational health and safety regulations?
For trenches in cohesive soil up to 3.6 m deep, Canadian OHS regulations typically allow a maximum slope of 1 horizontal to 1 vertical (45 degrees) without addi
Start free practice for Excavator Operator Certification Exam Prep
263 questions · no signup required · 40 free questions per day
Question: A trench is being excavated in cohesive soil to a depth of 2.1 m. What is the minimum slope angle for the sides of the trench, without additional shoring or support, as per Canadian occupational health and safety regulations?
Answer options: ✅ 1:1 (45 degrees)
- 3:4 (approximately 37 degrees)
- 1:2 (approximately 26.6 degrees)
- 1:3 (approximately 18.4 degrees)
Correct answer: 1:1 (45 degrees)
Explanation: For trenches in cohesive soil up to 3.6 m deep, Canadian OHS regulations typically allow a maximum slope of 1 horizontal to 1 vertical (45 degrees) without additional shoring. Slopes shallower than this, like 1:2 or 1:3, are for less stable soil types or greater depths.
Start free practice for Excavator Operator Certification Exam Prep
263 questions · no signup required · 40 free questions per day
More about Excavator Operator Certification Exam Prep
Related Questions
- During a final inspection of an excavator, prior to beginning work, an operator notices significant play in th
- An excavator operator is preparing to dig a trench in cohesive soil. To achieve maximum breakout force, what a
- Which control typically governs the arm (or dipper arm) movement for an excavator?
- What condition might require sloping or shoring of a trench less than 1.2 meters (4 feet) deep?
- According to IUOE best practices, what is the LAST thing an operator should do before leaving the excavator's
- Travel on slope — bucket should be:
More for Excavator Operator Certification Exam Prep candidates
Question explanations
- During a final inspection of an excavator, prior to beginning work, an operator notices significant play in th
- An excavator operator is preparing to dig a trench in cohesive soil. To achieve maximum breakout force, what a
- Which control typically governs the arm (or dipper arm) movement for an excavator?
- What condition might require sloping or shoring of a trench less than 1.2 meters (4 feet) deep?
Ready to practice?
Free, no signup required. Build a wrong-question list as you go.
Start Free Excavator Operator Certification Exam Prep Practice →Related courses
Other Canadian certifications candidates often prepare for alongside this one.