Excavator Operator Certification Exam Prep · Question
A 10-tonne mini excavator with rubber tracks is being secured on a flatbed trailer for transport. According to CSA Standard B620, what is the minimum number of securement points (tiedowns) required for this machine?
CSA Standard B620 specifies that heavy equipment must be secured with a minimum of four tiedowns. These should be placed at or near each corner of the machine t
Start free practice for Excavator Operator Certification Exam Prep
263 questions · no signup required · 40 free questions per day
Question: A 10-tonne mini excavator with rubber tracks is being secured on a flatbed trailer for transport. According to CSA Standard B620, what is the minimum number of securement points (tiedowns) required for this machine?
Answer options:
- Two, one at each end of the machine.
- Three, distributed evenly. ✅ Four, one at each corner of the machine.
- Six, three per side.
Correct answer: Four, one at each corner of the machine.
Explanation: CSA Standard B620 specifies that heavy equipment must be secured with a minimum of four tiedowns. These should be placed at or near each corner of the machine to prevent movement in all directions.
Start free practice for Excavator Operator Certification Exam Prep
263 questions · no signup required · 40 free questions per day
More about Excavator Operator Certification Exam Prep
Related Questions
- During a final inspection of an excavator, prior to beginning work, an operator notices significant play in th
- An excavator operator is preparing to dig a trench in cohesive soil. To achieve maximum breakout force, what a
- Which control typically governs the arm (or dipper arm) movement for an excavator?
- What condition might require sloping or shoring of a trench less than 1.2 meters (4 feet) deep?
- According to IUOE best practices, what is the LAST thing an operator should do before leaving the excavator's
- Travel on slope — bucket should be:
More for Excavator Operator Certification Exam Prep candidates
Question explanations
- During a final inspection of an excavator, prior to beginning work, an operator notices significant play in th
- An excavator operator is preparing to dig a trench in cohesive soil. To achieve maximum breakout force, what a
- Which control typically governs the arm (or dipper arm) movement for an excavator?
- What condition might require sloping or shoring of a trench less than 1.2 meters (4 feet) deep?
Ready to practice?
Free, no signup required. Build a wrong-question list as you go.
Start Free Excavator Operator Certification Exam Prep Practice →Related courses
Other Canadian certifications candidates often prepare for alongside this one.