Excavator Operator Certification Exam Prep · Question
What is the minimum horizontal distance a spoil pile should typically be kept from the edge of an excavation, according to safety regulations?
Provincial regulations, such as WorkSafeBC G20.94 and Ontario Reg 213/91 (s. 233(3)), generally mandate keeping spoil piles at least 1.0 metre (3.3 feet) from t
Start free practice for Excavator Operator Certification Exam Prep
263 questions · no signup required · 40 free questions per day
Question: What is the minimum horizontal distance a spoil pile should typically be kept from the edge of an excavation, according to safety regulations?
Answer options: ✅ 1.0 metre (3.3 feet)
- 0.5 metres (1.6 feet)
- 2.0 metres (6.6 feet)
- Immediately adjacent to the trench edge
Correct answer: 1.0 metre (3.3 feet)
Explanation: Provincial regulations, such as WorkSafeBC G20.94 and Ontario Reg 213/91 (s. 233(3)), generally mandate keeping spoil piles at least 1.0 metre (3.3 feet) from the edge of an excavation to prevent material from falling back in and to reduce surcharge weight on the trench wall.
Start free practice for Excavator Operator Certification Exam Prep
263 questions · no signup required · 40 free questions per day
More about Excavator Operator Certification Exam Prep
Related Questions
- During a final inspection of an excavator, prior to beginning work, an operator notices significant play in th
- An excavator operator is preparing to dig a trench in cohesive soil. To achieve maximum breakout force, what a
- Which control typically governs the arm (or dipper arm) movement for an excavator?
- What condition might require sloping or shoring of a trench less than 1.2 meters (4 feet) deep?
- According to IUOE best practices, what is the LAST thing an operator should do before leaving the excavator's
- Travel on slope — bucket should be:
More for Excavator Operator Certification Exam Prep candidates
Question explanations
- During a final inspection of an excavator, prior to beginning work, an operator notices significant play in th
- An excavator operator is preparing to dig a trench in cohesive soil. To achieve maximum breakout force, what a
- Which control typically governs the arm (or dipper arm) movement for an excavator?
- What condition might require sloping or shoring of a trench less than 1.2 meters (4 feet) deep?
Ready to practice?
Free, no signup required. Build a wrong-question list as you go.
Start Free Excavator Operator Certification Exam Prep Practice →Related courses