What is the consequence of preparing a subgrade with inadequate crown or cross-slope on a roadway?
Proper crown or cross-slope is essential for pavement drainage. Without it, water will accumulate, saturate the subgrade, and significantly reduce the structura
Start free practice for Excavator Operator Certification Exam Prep
263 questions · no signup required · 40 free questions per day
Question: What is the consequence of preparing a subgrade with inadequate crown or cross-slope on a roadway?
Answer options:
- Increased pavement life due to less stress. ✅ Poor drainage, leading to water ponding, potential subgrade saturation, and pavement deterioration.
- Improved traction for vehicles during wet weather.
- Reduced construction costs due to less material movement.
Correct answer: Poor drainage, leading to water ponding, potential subgrade saturation, and pavement deterioration.
Explanation: Proper crown or cross-slope is essential for pavement drainage. Without it, water will accumulate, saturate the subgrade, and significantly reduce the structural integrity and lifespan of the pavement.
Start free practice for Excavator Operator Certification Exam Prep
263 questions · no signup required · 40 free questions per day
More about Excavator Operator Certification Exam Prep
Related Questions
- During a final inspection of an excavator, prior to beginning work, an operator notices significant play in th
- An excavator operator is preparing to dig a trench in cohesive soil. To achieve maximum breakout force, what a
- Which control typically governs the arm (or dipper arm) movement for an excavator?
- What condition might require sloping or shoring of a trench less than 1.2 meters (4 feet) deep?
- According to IUOE best practices, what is the LAST thing an operator should do before leaving the excavator's
- Travel on slope — bucket should be:
More for Excavator Operator Certification Exam Prep candidates
Question explanations
- During a final inspection of an excavator, prior to beginning work, an operator notices significant play in th
- An excavator operator is preparing to dig a trench in cohesive soil. To achieve maximum breakout force, what a
- Which control typically governs the arm (or dipper arm) movement for an excavator?
- What condition might require sloping or shoring of a trench less than 1.2 meters (4 feet) deep?
Ready to practice?
Free, no signup required. Build a wrong-question list as you go.
Start Free Excavator Operator Certification Exam Prep Practice →Related courses
Other Canadian certifications candidates often prepare for alongside this one.