Skip to main content

Gas Fitter Practice · Question

What is the acceptable method for terminating a Type B vent above a flat roof?

CSA B149.1 requires Type B vents to terminate at least 2 feet (600 mm) above any part of the building within a 10-foot (3 m) horizontal distance.

Start free practice for Gas Fitter Practice

200 questions · no signup required · 40 free questions per day

Start Practice →

Question: What is the acceptable method for terminating a Type B vent above a flat roof?

Answer options:

  • At least 6 inches (150 mm) above the roof line
  • At least 12 inches (300 mm) above the roof line
  • At least 2 feet (600 mm) above the highest point where it passes through the roof ✅ At least 2 feet (600 mm) above any part of the building within 10 feet (3 m)

Correct answer: At least 2 feet (600 mm) above any part of the building within 10 feet (3 m)

Explanation: CSA B149.1 requires Type B vents to terminate at least 2 feet (600 mm) above any part of the building within a 10-foot (3 m) horizontal distance.

Start free practice for Gas Fitter Practice

200 questions · no signup required · 40 free questions per day

Start Practice →

More about Gas Fitter Practice

Related Questions

More for Gas Fitter Practice candidates

Ready to practice?

Free, no signup required. Build a wrong-question list as you go.

Start Free Gas Fitter Practice Practice →

Related courses

Other Canadian certifications candidates often prepare for alongside this one.