After inspecting the tracks of a large excavator, you observe a track pad bolt that has completely fallen out, creating a loose track pad. The manufacturer's manual indicates 300 track pad bolts per side. What percentage of bolts are missing if this is the only loose or missing bolt identified?

If one bolt out of 300 is missing, the percentage is (1/300) * 100% = 0.33%. This is less than 1%. Even a small percentage can indicate a problem. (Simple perce

Start free practice for Heavy Equipment Operator Certification Exam Prep

500 questions · no signup required · 40 free questions per day

Start Practice →

Question: After inspecting the tracks of a large excavator, you observe a track pad bolt that has completely fallen out, creating a loose track pad. The manufacturer's manual indicates 300 track pad bolts per side. What percentage of bolts are missing if this is the only loose or missing bolt identified?

Answer options: ✅ Less than 1%

  • Approximately 5%
  • More than 10%
  • Exactly 1%

Correct answer: Less than 1%

Explanation: If one bolt out of 300 is missing, the percentage is (1/300) * 100% = 0.33%. This is less than 1%. Even a small percentage can indicate a problem. (Simple percentage calculation)

Start free practice for Heavy Equipment Operator Certification Exam Prep

500 questions · no signup required · 40 free questions per day

Start Practice →

More about Heavy Equipment Operator Certification Exam Prep

Related Questions

More for Heavy Equipment Operator Certification Exam Prep candidates

Ready to practice?

Free, no signup required. Build a wrong-question list as you go.

Start Free Heavy Equipment Operator Certification Exam Prep Practice →

Related courses

Other Canadian certifications candidates often prepare for alongside this one.