Heavy Equipment Operator Certification Exam Prep · Question

A granular base course for a road project requires 500 cubic metres (CM) of compacted material. If the material has a shrinkage factor of 15% from its loose state, how many loose cubic metres (LCM) must be ordered?

To determine the required Loose Cubic Metres (LCM) from Compacted Cubic Metres (CCM) with a shrinkage factor, use the formula: LCM = CCM / (1 - Shrinkage Factor

Start free practice for Heavy Equipment Operator Certification Exam Prep

500 questions · no signup required · 40 free questions per day

Start Practice →

Question: A granular base course for a road project requires 500 cubic metres (CM) of compacted material. If the material has a shrinkage factor of 15% from its loose state, how many loose cubic metres (LCM) must be ordered?

Answer options:

  • 425 LCM
  • 500 LCM
  • 575 LCM ✅ ~588 LCM

Correct answer: ~588 LCM

Explanation: To determine the required Loose Cubic Metres (LCM) from Compacted Cubic Metres (CCM) with a shrinkage factor, use the formula: LCM = CCM / (1 - Shrinkage Factor). So, LCM = 500 CCM / (1 - 0.15) = 500 / 0.85 ≈ 588.24 LCM. Therefore, approximately 588 LCM should be ordered.

Start free practice for Heavy Equipment Operator Certification Exam Prep

500 questions · no signup required · 40 free questions per day

Start Practice →

More about Heavy Equipment Operator Certification Exam Prep

Related Questions

More for Heavy Equipment Operator Certification Exam Prep candidates

Ready to practice?

Free, no signup required. Build a wrong-question list as you go.

Start Free Heavy Equipment Operator Certification Exam Prep Practice →

Related courses

Other Canadian certifications candidates often prepare for alongside this one.