When installing a storm sewer pipe with a 300 mm diameter and a required slope of 0.5%, what is the minimum fall needed over a 50-metre section to ensure proper drainage?

To calculate the fall, multiply the length by the slope: 50 metres * 0.005 (0.5%) = 0.25 metres, which is 25 centimetres. This ensures adequate gravity flow for

Start free practice for Heavy Equipment Operator Certification Exam Prep

500 questions · no signup required · 40 free questions per day

Start Practice →

Question: When installing a storm sewer pipe with a 300 mm diameter and a required slope of 0.5%, what is the minimum fall needed over a 50-metre section to ensure proper drainage?

Answer options: ✅ 25 centimetres

  • 50 centimetres
  • 2.5 metres
  • 5.0 metres

Correct answer: 25 centimetres

Explanation: To calculate the fall, multiply the length by the slope: 50 metres * 0.005 (0.5%) = 0.25 metres, which is 25 centimetres. This ensures adequate gravity flow for the pipe.

Start free practice for Heavy Equipment Operator Certification Exam Prep

500 questions · no signup required · 40 free questions per day

Start Practice →

More about Heavy Equipment Operator Certification Exam Prep

Related Questions

More for Heavy Equipment Operator Certification Exam Prep candidates

Ready to practice?

Free, no signup required. Build a wrong-question list as you go.

Start Free Heavy Equipment Operator Certification Exam Prep Practice →

Related courses

Other Canadian certifications candidates often prepare for alongside this one.