Heavy Equipment Operator Certification Exam Prep · Question
According to Ontario Reg 213/91 Construction Projects, what is a critical consideration regarding material placement when excavating a trench?
Ontario Reg 213/91, Section 234(1)(b), states that excavated material shall be piled at least 1.2 m from the edge of the excavation to prevent it from falling b
Start free practice for Heavy Equipment Operator Certification Exam Prep
500 questions · no signup required · 40 free questions per day
Question: According to Ontario Reg 213/91 Construction Projects, what is a critical consideration regarding material placement when excavating a trench?
Answer options:
- Excavated material (spoil) must be piled directly adjacent to the trench edge to facilitate backfilling. ✅ Spoil piles must be sloped away from the trench and kept at least 1.2 metres (4 feet) from the edge.
- Spoil should be placed on the low side of the trench to prevent it from rolling back in.
- There are no specific regulations regarding spoil placement, as long as it doesn't obstruct nearby traffic.
Correct answer: Spoil piles must be sloped away from the trench and kept at least 1.2 metres (4 feet) from the edge.
Explanation: Ontario Reg 213/91, Section 234(1)(b), states that excavated material shall be piled at least 1.2 m from the edge of the excavation to prevent it from falling back in and to reduce pressure on the trench wall, a critical safety measure.
Start free practice for Heavy Equipment Operator Certification Exam Prep
500 questions · no signup required · 40 free questions per day
More about Heavy Equipment Operator Certification Exam Prep
Related Questions
More for Heavy Equipment Operator Certification Exam Prep candidates
Ready to practice?
Free, no signup required. Build a wrong-question list as you go.
Start Free Heavy Equipment Operator Certification Exam Prep Practice →Related courses
Other Canadian certifications candidates often prepare for alongside this one.