An excavation measures 15 metres long, 8 metres wide, and 3 metres deep. If the soil has a swell factor of 25%, what is the bank cubic volume (BCM) of material to be excavated?

The bank cubic volume is calculated directly from the excavation dimensions: 15 m * 8 m * 3 m = 360 BCM. The swell factor is used for loose cubic volume calcula

Start free practice for Heavy Equipment Operator Certification Exam Prep

500 questions · no signup required · 40 free questions per day

Start Practice →

Question: An excavation measures 15 metres long, 8 metres wide, and 3 metres deep. If the soil has a swell factor of 25%, what is the bank cubic volume (BCM) of material to be excavated?

Answer options: ✅ 360 BCM

  • 288 BCM
  • 450 BCM
  • 300 BCM

Correct answer: 360 BCM

Explanation: The bank cubic volume is calculated directly from the excavation dimensions: 15 m * 8 m * 3 m = 360 BCM. The swell factor is used for loose cubic volume calculations, not bank volume. (Reference: OPSWA HEO Curriculum, Earthmoving Math Module).

Start free practice for Heavy Equipment Operator Certification Exam Prep

500 questions · no signup required · 40 free questions per day

Start Practice →

More about Heavy Equipment Operator Certification Exam Prep

Related Questions

More for Heavy Equipment Operator Certification Exam Prep candidates

Ready to practice?

Free, no signup required. Build a wrong-question list as you go.

Start Free Heavy Equipment Operator Certification Exam Prep Practice →

Related courses

Other Canadian certifications candidates often prepare for alongside this one.