A dozer pushes material 40 metres at an average speed of 5 km/h. The return trip is 8 km/h. If the dozer spends 30 seconds for blade load and dump cycle, what is its approximate total productive cycle time in minutes?

Push time: (40 m / 5000 m/hr) * 60 min/hr = 0.48 minutes. Return time: (40 m / 8000 m/hr) * 60 min/hr = 0.3 minutes. Fixed time (load/dump): 30 seconds = 0.5 mi

Start free practice for Heavy Equipment Operator Certification Exam Prep

500 questions · no signup required · 40 free questions per day

Start Practice →

Question: A dozer pushes material 40 metres at an average speed of 5 km/h. The return trip is 8 km/h. If the dozer spends 30 seconds for blade load and dump cycle, what is its approximate total productive cycle time in minutes?

Answer options:

  • 1.5 minutes ✅ 1.25 minutes
  • 1.75 minutes
  • 2 minutes

Correct answer: 1.25 minutes

Explanation: Push time: (40 m / 5000 m/hr) * 60 min/hr = 0.48 minutes. Return time: (40 m / 8000 m/hr) * 60 min/hr = 0.3 minutes. Fixed time (load/dump): 30 seconds = 0.5 minutes. Total cycle time = 0.48 + 0.3 + 0.5 = 1.28 minutes. Closest option is 1.25 minutes. (Reference: IUOE 793 Training Standards, Cycle Time Analysis).

Start free practice for Heavy Equipment Operator Certification Exam Prep

500 questions · no signup required · 40 free questions per day

Start Practice →

More about Heavy Equipment Operator Certification Exam Prep

Related Questions

More for Heavy Equipment Operator Certification Exam Prep candidates

Ready to practice?

Free, no signup required. Build a wrong-question list as you go.

Start Free Heavy Equipment Operator Certification Exam Prep Practice →

Related courses

Other Canadian certifications candidates often prepare for alongside this one.