A loader operating in a Y-pattern needs to load 450 tonnes of aggregate into trucks, with each truck having a capacity of 30 tonnes. If the loader's cycle time for a Y-pattern is 3 minutes per truck, how many hours will it take to load all the aggregate?

First, calculate the number of trucks needed: 450 tonnes / 30 tonnes/truck = 15 trucks. Then, calculate the total loading time: 15 trucks * 3 minutes/truck = 45

Start free practice for Loader Operator Certification Exam Prep

355 questions · no signup required · 40 free questions per day

Start Practice →

Question: A loader operating in a Y-pattern needs to load 450 tonnes of aggregate into trucks, with each truck having a capacity of 30 tonnes. If the loader's cycle time for a Y-pattern is 3 minutes per truck, how many hours will it take to load all the aggregate?

Answer options:

  • 1.5 hours ✅ 2 hours
  • 2.5 hours
  • 3 hours

Correct answer: 2 hours

Explanation: First, calculate the number of trucks needed: 450 tonnes / 30 tonnes/truck = 15 trucks. Then, calculate the total loading time: 15 trucks * 3 minutes/truck = 45 minutes. Convert minutes to hours: 45 minutes / 60 minutes/hour = 0.75 hours. Therefore, 0.75 hours will be required.

Start free practice for Loader Operator Certification Exam Prep

355 questions · no signup required · 40 free questions per day

Start Practice →

More about Loader Operator Certification Exam Prep

Related Questions

More for Loader Operator Certification Exam Prep candidates

Ready to practice?

Free, no signup required. Build a wrong-question list as you go.

Start Free Loader Operator Certification Exam Prep Practice →

Related courses

Other Canadian certifications candidates often prepare for alongside this one.