A welder is setting up for a gas metal arc welding (GMAW) operation using argon shielding gas inside a large storage tank that workers enter via a single manhole, approximately 80 cm in diameter, located on the top. The atmospheric tests show 20.9% oxygen, LEL 0%, and no toxic gases. Which of the following is the most important additional safety measure required before starting to weld?
Even if initial atmospheric tests are good, welding in a confined space with inert gas (argon) can rapidly deplete oxygen, and fumes can accumulate. Continuous
Start free practice for Welder Red Seal
154 questions · no signup required · 40 free questions per day
Question: A welder is setting up for a gas metal arc welding (GMAW) operation using argon shielding gas inside a large storage tank that workers enter via a single manhole, approximately 80 cm in diameter, located on the top. The atmospheric tests show 20.9% oxygen, LEL 0%, and no toxic gases. Which of the following is the most important additional safety measure required before starting to weld?
Answer options: ✅ Establishing continuous mechanical ventilation and a dedicated confined space attendant outside.
- Ensuring all electrical cables are rated for damp locations.
- Attaching a safety harness and lifeline to the welder.
- Placing a fire extinguisher within arm's reach of the welder.
Correct answer: Establishing continuous mechanical ventilation and a dedicated confined space attendant outside.
Explanation: Even if initial atmospheric tests are good, welding in a confined space with inert gas (argon) can rapidly deplete oxygen, and fumes can accumulate. Continuous mechanical ventilation is crucial to maintain air quality, and a confined space attendant is required to monitor the welder and initiate rescue if needed. While a safety harness and fire extinguisher are important, they do not address the immediate atmospheric hazards of welding in a confined space.
Start free practice for Welder Red Seal
154 questions · no signup required · 40 free questions per day
More about Welder Red Seal
Related Questions
- A welder is fabricating a pressure vessel component using FCAW-G with an E70T-1 wire. The procedure specifies
- A welder is preparing to weld 20 mm (0.8 in) thick high-strength low-alloy (HSLA) steel using FCAW-G. The weld
- A structural steel fabricator is using FCAW-S (E71T-8 wire) to weld heavy sections of structural steel in an o
- When performing FCAW-G (gas-shielded flux-cored arc welding), a welder notices the arc is unstable and the wir
- A structural welder is performing overhead FCAW-G on 12 mm (0.5 in) thick steel with an E71T-1 wire. The weld
- A welder is setting up an FCAW-S machine for welding in a remote location without access to external shielding
More for Welder Red Seal candidates
Practice tests
Question explanations
- A welder is fabricating a pressure vessel component using FCAW-G with an E70T-1 wire. The procedure specifies
- A welder is preparing to weld 20 mm (0.8 in) thick high-strength low-alloy (HSLA) steel using FCAW-G. The weld
- A structural steel fabricator is using FCAW-S (E71T-8 wire) to weld heavy sections of structural steel in an o
- When performing FCAW-G (gas-shielded flux-cored arc welding), a welder notices the arc is unstable and the wir
Ready to practice?
Free, no signup required. Build a wrong-question list as you go.
Start Free Welder Red Seal Practice →Related courses
Other Canadian certifications candidates often prepare for alongside this one.