Welder Red Seal · Question
During a fabrication project, a welder is using a portable cutting torch next to a temporary combustible partition on a construction site. Who is directly responsible for issuing the hot work permit before the work begins?
The supervisor or designated hot work authority is typically responsible for issuing hot work permits, ensuring all safety precautions are in place before work
Start free practice for Welder Red Seal
154 questions · no signup required · 40 free questions per day
Question: During a fabrication project, a welder is using a portable cutting torch next to a temporary combustible partition on a construction site. Who is directly responsible for issuing the hot work permit before the work begins?
Answer options:
- The site safety officer.
- The welder performing the work.
- The project manager. ✅ The supervisor or designated hot work authority.
Correct answer: The supervisor or designated hot work authority.
Explanation: The supervisor or designated hot work authority is typically responsible for issuing hot work permits, ensuring all safety precautions are in place before work commences. While the site safety officer oversees general safety, and the welder performs the work, permit issuance falls under the direct authority of the supervisor managing the specific task.
Start free practice for Welder Red Seal
154 questions · no signup required · 40 free questions per day
More about Welder Red Seal
Related Questions
- A welder is fabricating a pressure vessel component using FCAW-G with an E70T-1 wire. The procedure specifies
- A welder is preparing to weld 20 mm (0.8 in) thick high-strength low-alloy (HSLA) steel using FCAW-G. The weld
- A structural steel fabricator is using FCAW-S (E71T-8 wire) to weld heavy sections of structural steel in an o
- When performing FCAW-G (gas-shielded flux-cored arc welding), a welder notices the arc is unstable and the wir
- A structural welder is performing overhead FCAW-G on 12 mm (0.5 in) thick steel with an E71T-1 wire. The weld
- A welder is setting up an FCAW-S machine for welding in a remote location without access to external shielding
More for Welder Red Seal candidates
Practice tests
Question explanations
- A welder is fabricating a pressure vessel component using FCAW-G with an E70T-1 wire. The procedure specifies
- A welder is preparing to weld 20 mm (0.8 in) thick high-strength low-alloy (HSLA) steel using FCAW-G. The weld
- A structural steel fabricator is using FCAW-S (E71T-8 wire) to weld heavy sections of structural steel in an o
- When performing FCAW-G (gas-shielded flux-cored arc welding), a welder notices the arc is unstable and the wir
Ready to practice?
Free, no signup required. Build a wrong-question list as you go.
Start Free Welder Red Seal Practice →Related courses
Other Canadian certifications candidates often prepare for alongside this one.