A company is required to perform Post Weld Heat Treatment (PWHT) on a pressure vessel fabricated from P1 Group 1 material, 30 mm thick, according to ASME B31.1. The code specifies a minimum holding temperature of 595 °C and a minimum holding time of 1 hour per 25 mm of thickness. What is the minimum required holding time for this vessel?
The requirement is 1 hour per 25 mm of thickness. For a 30 mm thick vessel, the calculation is (30 mm / 25 mm/hour) * 1 hour = 1.2 hours. This ensures the mater
Start free practice for Welder Red Seal
154 questions · no signup required · 40 free questions per day
Question: A company is required to perform Post Weld Heat Treatment (PWHT) on a pressure vessel fabricated from P1 Group 1 material, 30 mm thick, according to ASME B31.1. The code specifies a minimum holding temperature of 595 °C and a minimum holding time of 1 hour per 25 mm of thickness. What is the minimum required holding time for this vessel?
Answer options:
- 1.0 hour ✅ 1.2 hours
- 1.5 hours
- 2.0 hours
Correct answer: 1.2 hours
Explanation: The requirement is 1 hour per 25 mm of thickness. For a 30 mm thick vessel, the calculation is (30 mm / 25 mm/hour) * 1 hour = 1.2 hours. This ensures the material receives adequate soaking at the elevated temperature to relieve residual stresses and improve microstructure.
Start free practice for Welder Red Seal
154 questions · no signup required · 40 free questions per day
More about Welder Red Seal
Related Questions
- A welder is fabricating a pressure vessel component using FCAW-G with an E70T-1 wire. The procedure specifies
- A welder is preparing to weld 20 mm (0.8 in) thick high-strength low-alloy (HSLA) steel using FCAW-G. The weld
- A structural steel fabricator is using FCAW-S (E71T-8 wire) to weld heavy sections of structural steel in an o
- When performing FCAW-G (gas-shielded flux-cored arc welding), a welder notices the arc is unstable and the wir
- A structural welder is performing overhead FCAW-G on 12 mm (0.5 in) thick steel with an E71T-1 wire. The weld
- A welder is setting up an FCAW-S machine for welding in a remote location without access to external shielding
More for Welder Red Seal candidates
Practice tests
Question explanations
- A welder is fabricating a pressure vessel component using FCAW-G with an E70T-1 wire. The procedure specifies
- A welder is preparing to weld 20 mm (0.8 in) thick high-strength low-alloy (HSLA) steel using FCAW-G. The weld
- A structural steel fabricator is using FCAW-S (E71T-8 wire) to weld heavy sections of structural steel in an o
- When performing FCAW-G (gas-shielded flux-cored arc welding), a welder notices the arc is unstable and the wir
Ready to practice?
Free, no signup required. Build a wrong-question list as you go.
Start Free Welder Red Seal Practice →Related courses
Other Canadian certifications candidates often prepare for alongside this one.