Welder Red Seal · Question
A welder is attempting to qualify a new welding procedure for a pressure piping system using Gas Tungsten Arc Welding (GTAW) on P-Number 8 material, 6 mm thick. The Pressure Welding Procedure Specification (PWPS) has been drafted. Before proceeding with the qualification test coupon, what essential steps must be taken according to ASME Section IX, related to the PWPS, to ensure a valid qualification?
According to ASME Section IX and various jurisdictional requirements, a Welding Procedure Specification (WPS) for pressure welding must generally be approved an
Start free practice for Welder Red Seal
154 questions · no signup required · 40 free questions per day
Question: A welder is attempting to qualify a new welding procedure for a pressure piping system using Gas Tungsten Arc Welding (GTAW) on P-Number 8 material, 6 mm thick. The Pressure Welding Procedure Specification (PWPS) has been drafted. Before proceeding with the qualification test coupon, what essential steps must be taken according to ASME Section IX, related to the PWPS, to ensure a valid qualification?
Answer options:
- The PWPS only needs to be witnessed by the welder and a qualified quality control person. ✅ The PWPS must be approved and signed by a professional engineer before welding the test coupon.
- The welder must perform a dry run of the procedure on scrap material to confirm its feasibility.
- The PWPS must be submitted to the jurisdictional authority for review and approval before fabrication commences.
Correct answer: The PWPS must be approved and signed by a professional engineer before welding the test coupon.
Explanation: According to ASME Section IX and various jurisdictional requirements, a Welding Procedure Specification (WPS) for pressure welding must generally be approved and signed by a professional engineer before a test coupon is welded based on that WPS. This ensures the technical soundness of the procedure before qualification. While dry runs are good practice, and jurisdictional approval is eventually needed, the engineer's sign-off on the PWPS itself is a critical prerequisite for the qualification test.
Start free practice for Welder Red Seal
154 questions · no signup required · 40 free questions per day
More about Welder Red Seal
Related Questions
- A welder is fabricating a pressure vessel component using FCAW-G with an E70T-1 wire. The procedure specifies
- A welder is preparing to weld 20 mm (0.8 in) thick high-strength low-alloy (HSLA) steel using FCAW-G. The weld
- A structural steel fabricator is using FCAW-S (E71T-8 wire) to weld heavy sections of structural steel in an o
- When performing FCAW-G (gas-shielded flux-cored arc welding), a welder notices the arc is unstable and the wir
- A structural welder is performing overhead FCAW-G on 12 mm (0.5 in) thick steel with an E71T-1 wire. The weld
- A welder is setting up an FCAW-S machine for welding in a remote location without access to external shielding
More for Welder Red Seal candidates
Practice tests
Question explanations
- A welder is fabricating a pressure vessel component using FCAW-G with an E70T-1 wire. The procedure specifies
- A welder is preparing to weld 20 mm (0.8 in) thick high-strength low-alloy (HSLA) steel using FCAW-G. The weld
- A structural steel fabricator is using FCAW-S (E71T-8 wire) to weld heavy sections of structural steel in an o
- When performing FCAW-G (gas-shielded flux-cored arc welding), a welder notices the arc is unstable and the wir
Ready to practice?
Free, no signup required. Build a wrong-question list as you go.
Start Free Welder Red Seal Practice →Related courses
Other Canadian certifications candidates often prepare for alongside this one.