A carpenter is installing a pre-hung interior door and notices that the door slab is rubbing against the hinge-side jamb at the top. The head jamb is level. What is the most appropriate action to correct this issue?
If the door is rubbing at the top on the hinge side, it indicates the top of the hinge-side jamb is pushing out too far. Adding a shim behind the top hinge on t
Start free practice for Carpenter Red Seal Exam Prep
300 questions · no signup required · 40 free questions per day
Question: A carpenter is installing a pre-hung interior door and notices that the door slab is rubbing against the hinge-side jamb at the top. The head jamb is level. What is the most appropriate action to correct this issue?
Answer options:
- Loosen the hinge screws on the frame side and push the top hinge out slightly, then re-tighten.
- Remove the door from the frame and plane a small amount off the top of the door slab.
- Install shims behind the bottom hinge on the frame side to push the bottom of the jamb out. ✅ Add a shim behind the top hinge on the frame side to pull the top of the jamb in slightly.
Correct answer: Add a shim behind the top hinge on the frame side to pull the top of the jamb in slightly.
Explanation: If the door is rubbing at the top on the hinge side, it indicates the top of the hinge-side jamb is pushing out too far. Adding a shim behind the top hinge on the frame side will pull that part of the jamb inward, correcting the rub. Planing the door should be a last resort after attempting adjustment.
Start free practice for Carpenter Red Seal Exam Prep
300 questions · no signup required · 40 free questions per day
More about Carpenter Red Seal Exam Prep
Related Questions
- When interpreting a foundation plan, a dashed line with 'P. WALL' typically represents which of the following?
- A site plan shows contour lines with an interval of 0.5 m. If two adjacent contour lines are labelled 124.0 m
- According to the National Building Code of Canada (NBC) 2020, what is the primary consideration for the requir
- Two offset stakes are driven at 2.0 m from the proposed edge of a concrete slab. The first stake is marked 'Cu
- What is the primary purpose of string lines and batter boards when laying out a foundation?
- According to typical blueprint conventions, a heavily dashed line (longer dashes) often represents an item tha
More for Carpenter Red Seal Exam Prep candidates
Practice tests
Question explanations
- When interpreting a foundation plan, a dashed line with 'P. WALL' typically represents which of the following?
- A site plan shows contour lines with an interval of 0.5 m. If two adjacent contour lines are labelled 124.0 m
- According to the National Building Code of Canada (NBC) 2020, what is the primary consideration for the requir
- Two offset stakes are driven at 2.0 m from the proposed edge of a concrete slab. The first stake is marked 'Cu
Ready to practice?
Free, no signup required. Build a wrong-question list as you go.
Start Free Carpenter Red Seal Exam Prep Practice →Related courses
Other Canadian certifications candidates often prepare for alongside this one.