Carpenter Red Seal Exam Prep · Question
A carpenter is tasked with installing a continuous handrail on a residential stair that makes a 90-degree turn with an intermediate landing. To ensure a smooth, continuous flow and code compliance (CSA A440.1/A440.2), what type of handrail fitting would typically be used at the inside corner of the turn?
For a continuous handrail changing direction at a landing, specialized fittings like a 'quarter-turn' or an 'up-easement and gooseneck' combination are used to
Start free practice for Carpenter Red Seal Exam Prep
300 questions · no signup required · 40 free questions per day
Question: A carpenter is tasked with installing a continuous handrail on a residential stair that makes a 90-degree turn with an intermediate landing. To ensure a smooth, continuous flow and code compliance (CSA A440.1/A440.2), what type of handrail fitting would typically be used at the inside corner of the turn?
Answer options:
- A butt joint with a metal plate.
- Two 45-degree mitred rail sections joined with screws.
- A volute. ✅ A 'quarter-turn' or 'up-easement and gooseneck' fitting combination.
Correct answer: A 'quarter-turn' or 'up-easement and gooseneck' fitting combination.
Explanation: For a continuous handrail changing direction at a landing, specialized fittings like a 'quarter-turn' or an 'up-easement and gooseneck' combination are used to maintain a smooth, graspable surface without sharp angles, which is required for code compliance. Butt joints or simple mitres would create an uncomfortable and non-compliant break in the continuous grasp. A volute is used at the starting newel post, not at an intermediate turn.
Start free practice for Carpenter Red Seal Exam Prep
300 questions · no signup required · 40 free questions per day
More about Carpenter Red Seal Exam Prep
Related Questions
- When interpreting a foundation plan, a dashed line with 'P. WALL' typically represents which of the following?
- A site plan shows contour lines with an interval of 0.5 m. If two adjacent contour lines are labelled 124.0 m
- According to the National Building Code of Canada (NBC) 2020, what is the primary consideration for the requir
- Two offset stakes are driven at 2.0 m from the proposed edge of a concrete slab. The first stake is marked 'Cu
- What is the primary purpose of string lines and batter boards when laying out a foundation?
- According to typical blueprint conventions, a heavily dashed line (longer dashes) often represents an item tha
More for Carpenter Red Seal Exam Prep candidates
Practice tests
Question explanations
- When interpreting a foundation plan, a dashed line with 'P. WALL' typically represents which of the following?
- A site plan shows contour lines with an interval of 0.5 m. If two adjacent contour lines are labelled 124.0 m
- According to the National Building Code of Canada (NBC) 2020, what is the primary consideration for the requir
- Two offset stakes are driven at 2.0 m from the proposed edge of a concrete slab. The first stake is marked 'Cu
Ready to practice?
Free, no signup required. Build a wrong-question list as you go.
Start Free Carpenter Red Seal Exam Prep Practice →Related courses
Other Canadian certifications candidates often prepare for alongside this one.