A carpenter is replacing a damaged baluster on an existing staircase. The existing balusters are mortised into the tread and dovetailed into the handrail. What is the most efficient and least destructive method to remove the damaged baluster without damaging the handrail or tread?
If balusters are dovetailed into the handrail, carefully loosening the handrail is often necessary to disengage the joint without damaging the handrail or the a
Start free practice for Carpenter Red Seal Exam Prep
300 questions · no signup required · 40 free questions per day
Question: A carpenter is replacing a damaged baluster on an existing staircase. The existing balusters are mortised into the tread and dovetailed into the handrail. What is the most efficient and least destructive method to remove the damaged baluster without damaging the handrail or tread?
Answer options:
- Cut the baluster flush with the tread and handrail, then extract the remaining pieces.
- Forcefully pry the baluster out from the handrail, then remove it from the tread. ✅ Carefully loosen the handrail to free the baluster, then remove it from the mortise in the tread.
- Drill several holes into the baluster where it meets the handrail to weaken the joint, then pull it out.
Correct answer: Carefully loosen the handrail to free the baluster, then remove it from the mortise in the tread.
Explanation: If balusters are dovetailed into the handrail, carefully loosening the handrail is often necessary to disengage the joint without damaging the handrail or the adjacent balusters. Cutting or prying can cause significant damage to the surrounding components, and drilling multiple holes may weaken the handrail.
Start free practice for Carpenter Red Seal Exam Prep
300 questions · no signup required · 40 free questions per day
More about Carpenter Red Seal Exam Prep
Related Questions
- When interpreting a foundation plan, a dashed line with 'P. WALL' typically represents which of the following?
- A site plan shows contour lines with an interval of 0.5 m. If two adjacent contour lines are labelled 124.0 m
- According to the National Building Code of Canada (NBC) 2020, what is the primary consideration for the requir
- Two offset stakes are driven at 2.0 m from the proposed edge of a concrete slab. The first stake is marked 'Cu
- What is the primary purpose of string lines and batter boards when laying out a foundation?
- According to typical blueprint conventions, a heavily dashed line (longer dashes) often represents an item tha
More for Carpenter Red Seal Exam Prep candidates
Practice tests
Question explanations
- When interpreting a foundation plan, a dashed line with 'P. WALL' typically represents which of the following?
- A site plan shows contour lines with an interval of 0.5 m. If two adjacent contour lines are labelled 124.0 m
- According to the National Building Code of Canada (NBC) 2020, what is the primary consideration for the requir
- Two offset stakes are driven at 2.0 m from the proposed edge of a concrete slab. The first stake is marked 'Cu
Ready to practice?
Free, no signup required. Build a wrong-question list as you go.
Start Free Carpenter Red Seal Exam Prep Practice →Related courses
Other Canadian certifications candidates often prepare for alongside this one.