A carpenter is installing 19 mm tongue-and-groove plywood subflooring on joists spaced 400 mm on centre. What is the minimum recommended fastener schedule for nails along the joists if adhesive is also being used?
According to typical building codes and best practices for subfloor installation with adhesive, fasteners (nails or screws) should be spaced at 150 mm on centre
Start free practice for Carpenter Red Seal Exam Prep
300 questions · no signup required · 40 free questions per day
Question: A carpenter is installing 19 mm tongue-and-groove plywood subflooring on joists spaced 400 mm on centre. What is the minimum recommended fastener schedule for nails along the joists if adhesive is also being used?
Answer options:
- 100 mm on centre ✅ 150 mm on centre
- 200 mm on centre
- 300 mm on centre
Correct answer: 150 mm on centre
Explanation: According to typical building codes and best practices for subfloor installation with adhesive, fasteners (nails or screws) should be spaced at 150 mm on centre along joists to ensure adequate hold-down and prevent squeaks. Wider spacing may not adequately secure the subfloor, while closer spacing is often unnecessary when adhesive is applied.
Start free practice for Carpenter Red Seal Exam Prep
300 questions · no signup required · 40 free questions per day
More about Carpenter Red Seal Exam Prep
Related Questions
- When interpreting a foundation plan, a dashed line with 'P. WALL' typically represents which of the following?
- A site plan shows contour lines with an interval of 0.5 m. If two adjacent contour lines are labelled 124.0 m
- According to the National Building Code of Canada (NBC) 2020, what is the primary consideration for the requir
- Two offset stakes are driven at 2.0 m from the proposed edge of a concrete slab. The first stake is marked 'Cu
- What is the primary purpose of string lines and batter boards when laying out a foundation?
- According to typical blueprint conventions, a heavily dashed line (longer dashes) often represents an item tha
More for Carpenter Red Seal Exam Prep candidates
Practice tests
Question explanations
- When interpreting a foundation plan, a dashed line with 'P. WALL' typically represents which of the following?
- A site plan shows contour lines with an interval of 0.5 m. If two adjacent contour lines are labelled 124.0 m
- According to the National Building Code of Canada (NBC) 2020, what is the primary consideration for the requir
- Two offset stakes are driven at 2.0 m from the proposed edge of a concrete slab. The first stake is marked 'Cu
Ready to practice?
Free, no signup required. Build a wrong-question list as you go.
Start Free Carpenter Red Seal Exam Prep Practice →Related courses
Other Canadian certifications candidates often prepare for alongside this one.