Carpenter Red Seal Exam Prep · Question
A carpenter is specifying subfloor sheathing for a floor system over engineered wood joists (I-joists) that are spaced at 600 mm on centre. The floor is intended for heavy pedestrian traffic and potential point loads. Which subfloor panel thickness would meet or exceed minimum typical building code requirements for this joist spacing?
For joist spacing of 600 mm on centre, building codes in Canada typically require a subfloor thickness of at least 22.2 mm (7/8 inch) for OSB or 18.3 mm (23/32
Start free practice for Carpenter Red Seal Exam Prep
300 questions · no signup required · 40 free questions per day
Question: A carpenter is specifying subfloor sheathing for a floor system over engineered wood joists (I-joists) that are spaced at 600 mm on centre. The floor is intended for heavy pedestrian traffic and potential point loads. Which subfloor panel thickness would meet or exceed minimum typical building code requirements for this joist spacing?
Answer options:
- 12.7 mm Plywood (1/2")
- 15.9 mm OSB (5/8")
- 18.3 mm Plywood (23/32") ✅ 22.2 mm OSB (7/8")
Correct answer: 22.2 mm OSB (7/8")
Explanation: For joist spacing of 600 mm on centre, building codes in Canada typically require a subfloor thickness of at least 22.2 mm (7/8 inch) for OSB or 18.3 mm (23/32 inch) for plywood, assuming panel identification for joist spacing. Given the options, 22.2 mm OSB would be the most suitable and code-compliant choice for the specified joist spacing and anticipated loads.
Start free practice for Carpenter Red Seal Exam Prep
300 questions · no signup required · 40 free questions per day
More about Carpenter Red Seal Exam Prep
Related Questions
- When interpreting a foundation plan, a dashed line with 'P. WALL' typically represents which of the following?
- A site plan shows contour lines with an interval of 0.5 m. If two adjacent contour lines are labelled 124.0 m
- According to the National Building Code of Canada (NBC) 2020, what is the primary consideration for the requir
- Two offset stakes are driven at 2.0 m from the proposed edge of a concrete slab. The first stake is marked 'Cu
- What is the primary purpose of string lines and batter boards when laying out a foundation?
- According to typical blueprint conventions, a heavily dashed line (longer dashes) often represents an item tha
More for Carpenter Red Seal Exam Prep candidates
Practice tests
Question explanations
- When interpreting a foundation plan, a dashed line with 'P. WALL' typically represents which of the following?
- A site plan shows contour lines with an interval of 0.5 m. If two adjacent contour lines are labelled 124.0 m
- According to the National Building Code of Canada (NBC) 2020, what is the primary consideration for the requir
- Two offset stakes are driven at 2.0 m from the proposed edge of a concrete slab. The first stake is marked 'Cu
Ready to practice?
Free, no signup required. Build a wrong-question list as you go.
Start Free Carpenter Red Seal Exam Prep Practice →Related courses
Other Canadian certifications candidates often prepare for alongside this one.