A carpenter is preparing to install tongue-and-groove (T&G) subfloor panels. Which of the following is the most critical step to ensure a quiet and stable subfloor system?
Applying a generous, continuous bead of approved construction adhesive to the joists before laying T&G subfloor panels is crucial. This bonds the subfloor direc
Start free practice for Carpenter Red Seal Exam Prep
300 questions · no signup required · 40 free questions per day
Question: A carpenter is preparing to install tongue-and-groove (T&G) subfloor panels. Which of the following is the most critical step to ensure a quiet and stable subfloor system?
Answer options:
- Nailing the panels only around the perimeter of the room.
- Leaving a 6 mm gap between the panel ends and the wall sheathing. ✅ Applying a continuous bead of approved construction adhesive to the top edge of all joists before laying panels.
- Staggering panel end joints by at least 150 mm (6 inches) in adjacent rows.
Correct answer: Applying a continuous bead of approved construction adhesive to the top edge of all joists before laying panels.
Explanation: Applying a generous, continuous bead of approved construction adhesive to the joists before laying T&G subfloor panels is crucial. This bonds the subfloor directly to the joists, preventing movement that causes squeaks and enhancing the floor system's stiffness. While staggering joints and leaving expansion gaps are important, adhesive is key for squeak prevention.
Start free practice for Carpenter Red Seal Exam Prep
300 questions · no signup required · 40 free questions per day
More about Carpenter Red Seal Exam Prep
Related Questions
- When interpreting a foundation plan, a dashed line with 'P. WALL' typically represents which of the following?
- A site plan shows contour lines with an interval of 0.5 m. If two adjacent contour lines are labelled 124.0 m
- According to the National Building Code of Canada (NBC) 2020, what is the primary consideration for the requir
- Two offset stakes are driven at 2.0 m from the proposed edge of a concrete slab. The first stake is marked 'Cu
- What is the primary purpose of string lines and batter boards when laying out a foundation?
- According to typical blueprint conventions, a heavily dashed line (longer dashes) often represents an item tha
More for Carpenter Red Seal Exam Prep candidates
Practice tests
Question explanations
- When interpreting a foundation plan, a dashed line with 'P. WALL' typically represents which of the following?
- A site plan shows contour lines with an interval of 0.5 m. If two adjacent contour lines are labelled 124.0 m
- According to the National Building Code of Canada (NBC) 2020, what is the primary consideration for the requir
- Two offset stakes are driven at 2.0 m from the proposed edge of a concrete slab. The first stake is marked 'Cu
Ready to practice?
Free, no signup required. Build a wrong-question list as you go.
Start Free Carpenter Red Seal Exam Prep Practice →Related courses
Other Canadian certifications candidates often prepare for alongside this one.