Carpenter Red Seal Exam Prep · Question
A carpenter is laying out floor joists for a 4.0 m wide room. The joists are 38 mm x 184 mm SPF No. 2, and the design calls for a joist spacing of 400 mm on centre. The first joist is intended to be flush with the outside edge of the end rim joist. What is the distance from the outside edge of the end rim joist to the centreline of the third joist?
With a joist spacing of 400 mm on centre, the centreline of the third joist will be 2 x 400 mm from the centreline of the first joist. Since the first joist's c
Start free practice for Carpenter Red Seal Exam Prep
300 questions · no signup required · 40 free questions per day
Question: A carpenter is laying out floor joists for a 4.0 m wide room. The joists are 38 mm x 184 mm SPF No. 2, and the design calls for a joist spacing of 400 mm on centre. The first joist is intended to be flush with the outside edge of the end rim joist. What is the distance from the outside edge of the end rim joist to the centreline of the third joist?
Answer options:
- 800 mm
- 838 mm ✅ 1200 mm
- 1238 mm
Correct answer: 1200 mm
Explanation: With a joist spacing of 400 mm on centre, the centreline of the third joist will be 2 x 400 mm from the centreline of the first joist. Since the first joist's centreline is 19 mm (half of 38 mm) from the outside edge of the rim joist, the third joist's centreline will be 800 mm from the centreline of the first joist, which is 800 mm from the reference point.
Start free practice for Carpenter Red Seal Exam Prep
300 questions · no signup required · 40 free questions per day
More about Carpenter Red Seal Exam Prep
Related Questions
- When interpreting a foundation plan, a dashed line with 'P. WALL' typically represents which of the following?
- A site plan shows contour lines with an interval of 0.5 m. If two adjacent contour lines are labelled 124.0 m
- According to the National Building Code of Canada (NBC) 2020, what is the primary consideration for the requir
- Two offset stakes are driven at 2.0 m from the proposed edge of a concrete slab. The first stake is marked 'Cu
- What is the primary purpose of string lines and batter boards when laying out a foundation?
- According to typical blueprint conventions, a heavily dashed line (longer dashes) often represents an item tha
More for Carpenter Red Seal Exam Prep candidates
Practice tests
Question explanations
- When interpreting a foundation plan, a dashed line with 'P. WALL' typically represents which of the following?
- A site plan shows contour lines with an interval of 0.5 m. If two adjacent contour lines are labelled 124.0 m
- According to the National Building Code of Canada (NBC) 2020, what is the primary consideration for the requir
- Two offset stakes are driven at 2.0 m from the proposed edge of a concrete slab. The first stake is marked 'Cu
Ready to practice?
Free, no signup required. Build a wrong-question list as you go.
Start Free Carpenter Red Seal Exam Prep Practice →Related courses
Other Canadian certifications candidates often prepare for alongside this one.