A carpenter is cutting common rafters for a roof with a 7:12 pitch. The building width is 7.32 metres. What is the approximate length of the common rafter from the outside of the top plate to the ridge, before accounting for overhangs or ridge board deduction?
The total run of the roof is half the building width, so 7.32 m / 2 = 3.66 m. For a 7:12 pitch, the diagonal factor is calculated as the square root of (7^2 + 1
Start free practice for Carpenter Red Seal Exam Prep
300 questions · no signup required · 40 free questions per day
Question: A carpenter is cutting common rafters for a roof with a 7:12 pitch. The building width is 7.32 metres. What is the approximate length of the common rafter from the outside of the top plate to the ridge, before accounting for overhangs or ridge board deduction?
Answer options:
- 3.66 metres ✅ 4.20 metres
- 4.88 metres
- 5.05 metres
Correct answer: 4.20 metres
Explanation: The total run of the roof is half the building width, so 7.32 m / 2 = 3.66 m. For a 7:12 pitch, the diagonal factor is calculated as the square root of (7^2 + 12^2) / 12 = square root of (49 + 144) / 12 = square root of (193) / 12 = 13.89 / 12 = 1.1575. The rafter length is then the run multiplied by this factor: 3.66 m * 1.1575 = 4.236 m. Option 4.20 metres is the closest approximation.
Start free practice for Carpenter Red Seal Exam Prep
300 questions · no signup required · 40 free questions per day
More about Carpenter Red Seal Exam Prep
Related Questions
- When interpreting a foundation plan, a dashed line with 'P. WALL' typically represents which of the following?
- A site plan shows contour lines with an interval of 0.5 m. If two adjacent contour lines are labelled 124.0 m
- According to the National Building Code of Canada (NBC) 2020, what is the primary consideration for the requir
- Two offset stakes are driven at 2.0 m from the proposed edge of a concrete slab. The first stake is marked 'Cu
- What is the primary purpose of string lines and batter boards when laying out a foundation?
- According to typical blueprint conventions, a heavily dashed line (longer dashes) often represents an item tha
More for Carpenter Red Seal Exam Prep candidates
Practice tests
Question explanations
- When interpreting a foundation plan, a dashed line with 'P. WALL' typically represents which of the following?
- A site plan shows contour lines with an interval of 0.5 m. If two adjacent contour lines are labelled 124.0 m
- According to the National Building Code of Canada (NBC) 2020, what is the primary consideration for the requir
- Two offset stakes are driven at 2.0 m from the proposed edge of a concrete slab. The first stake is marked 'Cu
Ready to practice?
Free, no signup required. Build a wrong-question list as you go.
Start Free Carpenter Red Seal Exam Prep Practice →Related courses
Other Canadian certifications candidates often prepare for alongside this one.